SANTA ANA VISION ZERO PLAN <br />Appendix E <br />1 Install Concrete - Curb Ramp EA 20 8,000$ $160,000 <br />2 Install Concrete - Truck Apron Curb CY 12 1,500$ $18,000 <br />3 Install Concrete - Curb and Gutter CY 176 1,080$ $190,080 <br />4 Install Concrete - Sidewalk CY 65 1,040$ $67,600 <br />5 Install Concrete - Truck Apron CY 21 1,860$ $39,060 <br />6 Install Concrete - Driveway CY 141 1,040$ $146,640 <br />7 Install Concrete - Textured Paving CY 64 1,130$ $72,320 <br />8 Roadway Excavation CY 1528 260$ $397,280 <br />9 Remove Concrete CY 501 400$ $200,400 <br />10 Hot Mix Asphalt TON 234 345$ $80,730 <br />11 Slurry TON 68 790$ $53,720 <br />12 Base Repair (HMA) ****TON 277 345$ $95,565 <br />13 Raised Bike Path (HMA)TON 257 345$ $88,665 <br />14 CL2 Aggregate Base CY 692 180$ $124,560 <br />15 Signing and Striping LS 1 24,500$ $24,500 <br />16 Rubber Hump EA 81 200$ $16,200 <br />17 Landscape SF 1496 8$ $11,968 <br />18 Drainage Improvements LS 1 $143,000 $143,000 <br />19 Signal Modification EA 1 $250,000 $250,000 <br />$$22,,118800,,228888 <br />20 Minor Items (15% of Items 1-19) **LS 1 $328,000 $328,000 <br />$$22,,550088,,228888 <br />21 Mobilization (10% of Items 1-20)LS 1 $251,000 $251,000 <br />$$22,,775599,,228888 <br />$965,800 <br />$3,725,088 <br />$$33,,772255,,008888 <br />$$224400,,000000 <br />$$33,,996655,,008888 <br />* <br />**Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />***This feasibility level estimate includes a 35% contingency intended to compensate for the use of preliminary and limited information. <br />****8% of project area is assumed to require Base Repair <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. Utility improvements such as water, <br />communication, gas, etc. are not included in these estimates. <br />SSaanntt aa AA nnaa VVii ssii oonn ZZ eerroo <br />44 tthh SStt ffrroomm MMiinnttee rr SStt tt oo GGaarrffiiee lldd SStt <br />((CCoorrrriiddoorr SSaaffeettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: CCuurrbb EExxtteennssiioonnss,, DDiirreeccttiioonnaall CCuurrbb RRaammppss,, CCllaassss IIVV BBiikkee LLaanneess,, CCoonnttiinnuuoouuss SSiiddeewwaallkkss,, BBiikkee CCrroossssiinnggss,, <br />aanndd CCoonnfflliicctt SSttrriippiinngg)) <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />RROOAADDWWAAYY <br />Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />An additional $110K of roadway easment is estimated for the Continuous Sidewalk. <br />DDRRAAIINNAAGGEE <br />GGRRAANNDD TTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruuccttiioonn EEaasseemmeenntt**== <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />GGRRAANNDD TTOOTTAALL <br />CONSTRUCTION SUBTOTAL <br />CONTINGENCY (35%) *** <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />EELLEECCTTRRIICCAALL <br />Santa Ana Vision Zero Estimate <br />  <br />  <br />City Council 32 – 212 6/4/2024