Laserfiche WebLink
Appendix E <br />1 Install Concrete - Curb Ramp EA 8 8,000$ $64,000 <br />2 Install Concrete - Median Curb CY 19 1,500$ $28,500 <br />3 Install Concrete - Truck Apron Curb CY 13 1,500$ $19,500 <br />4 Install Concrete - Curb and Gutter CY 13 1,080$ $14,040 <br />5 Install Concrete - Sidewalk CY 21 1,040$ $21,840 <br />6 Install Concrete - Textured Pavment CY 29 1,130$ $32,770 <br />7 Install Concrete - Truck Apron CY 12 1,860$ $22,320 <br />8 Roadway Excavation CY 192 260$ $49,920 <br />9 Remove Concrete CY 54 400$ $21,600 <br />10 Hot Mix Asphalt TON 65 345$ $22,425 <br />11 Slurry TON 45 790$ $35,550 <br />12 Base Repair (HMA) ****TON 180 345$ $62,100 <br />13 CL2 Aggregate Base CY 75 180$ $13,500 <br />14 Signing and Striping LS 1 14,000$ $14,000 <br />15 Centerline Hardening EA 4 5,000$ $20,000 <br />16 Rubber Hump EA 14 200$ $2,800 <br />17 Bus Stop Improvements EA 1 30,000$ $30,000 <br />18 Signal Modification EA 1 $250,000 $250,000 <br />$$772244,,886655 <br />19 Minor Items (15% of Items 1-18) **LS 1 $109,000 $109,000 <br />$$883333,,886655 <br />20 Mobilization (10% of Items 1-19)LS 1 $84,000 $84,000 <br />$$991177,,886655 <br />$321,300 <br />$1,239,165 <br />$$11,,223399,,116655 <br />$$4400,,000000 <br />$$11,,227799,,116655 <br />* <br />**Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />***This feasibility level estimate includes a 35% contingency intended to compensate for the use of preliminary and limited information. <br />****8% of project area is assumed to require Base Repair <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. Utility improvements such as water, communication, gas, <br />etc. are not included in these estimates. <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />GGRRAANNDD TTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruuccttiioonn EEaasseemmeenntt**== <br />GGRRAANNDD TTOOTTAALL <br />Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />An additional $300K of roadway easment is estimated for the Multi-use Path. <br />SSaannttaa AA nnaa VV iissii oo nn ZZ eerroo <br />11 ss tt SStt aanndd FFll oo wweerr SStt IInn tt eerrss eecctt iioonn <br />((IInntteerrsseeccttiioonn SSaaffeettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: PPrrootteecctteedd CCoorrnneerrss,, DDiirreeccttiioonnaall CCuurrbb RRaammppss,, CCeenntteerrlliinnee HHaarrddeenniinngg,, CCllaassss IIII BBiikkee LLaanneess,, BBiikkee CCrroossssiinnggss,, aanndd <br />CCoonnfflliicctt SSttrriippiinngg)) <br />CONSTRUCTION SUBTOTAL <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />RROOAADDWWAAYY <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />EELLEECCTTRRIICCAALL <br />SSUUBBTTOOTTAALL <br />CONTINGENCY (35%) *** <br />Santa Ana Vision Zero Estimate <br />  <br />  <br />City Council 32 – 217 6/4/2024