Laserfiche WebLink
SANTA ANA VISION ZERO PLAN <br />Appendix E <br />1 Install Concrete - Curb Ramp EA 6 8,000$ $48,000 <br />2 Install Concrete - Median Curb CY 20 1,500$ $30,000 <br />3 Install Concrete - Truck Apron Curb CY 19 1,500$ $28,500 <br />4 Install Concrete - Curb and Gutter CY 19 1,080$ $20,520 <br />5 Install Concrete - Sidewalk CY 31 1,040$ $32,240 <br />6 Install Concrete - Textured Pavment CY 4 1,130$ $4,520 <br />7 Install Concrete - Truck Apron CY 58 1,860$ $107,880 <br />8 Roadway Excavation CY 366 260$ $95,160 <br />9 Remove Concrete CY 80 400$ $32,000 <br />10 Hot Mix Asphalt TON 62 345$ $21,390 <br />11 Slurry TON 32 790$ $25,280 <br />12 Base Repair (HMA) ****TON 128 345$ $44,160 <br />13 CL2 Aggregate Base CY 137 180$ $24,660 <br />14 Signing and Striping LS 1 5,700$ $5,700 <br />15 Landscape SF 2440 8$ $19,520 <br />16 Rubber Hump EA 9 200$ $1,800 <br />17 Bus Stop Improvements EA 1 30,000$ $30,000 <br />18 Minor Drainage LS 1 $20,000 $20,000 <br />$$559911,,333300 <br />19 Minor Items (15% of Items 1-18) **LS 1 $89,000 $89,000 <br />$$668800,,333300 <br />20 Mobilization (10% of Items 1-19)LS 1 $69,000 $69,000 <br />$$774499,,333300 <br />$262,300 <br />$1,011,630 <br />$$11,,001111,,663300 <br />$$5500,,000000 <br />$$11,,006611,,663300 <br />*Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />**Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />***This feasibility level estimate includes a 35% contingency intended to compensate for the use of preliminary and limited information. <br />****8% of project area is assumed to require Base Repair <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. Utility improvements such as water, <br />communication, gas, etc. are not included in these estimates. <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />CONTINGENCY (35%) *** <br />CONSTRUCTION SUBTOTAL <br />GGRRAANNDD TTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruuccttiioonn EEaasseemmeenntt**== <br />GGRRAANNDD TTOOTTAALL <br />SS aann ttaa AAnnaa VV iiss iioo nn ZZ eerr oo <br />EEdd iinngg eerr AA vvee aann dd MM aappll ee SS tt IInntt eerr sseecctt iioo nn <br />((IInntteerrsseeccttiioonn SSaaffeettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: DDiirreeccttiioonnaall CCuurrbb RRaammppss,, CCllaassss IIII BBiikkee LLaanneess,, aanndd CCoonnfflliicctt SSttrriippiinngg)) <br />SSUUBBTTOOTTAALL <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />RROOAADDWWAAYY <br />DDRRAAIINNAAGGEE <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />Santa Ana Vision Zero Estimate <br />  <br />  <br />City Council 32 – 218 6/4/2024