Laserfiche WebLink
SANTA ANA VISION ZERO PLAN <br />Appendix E <br />1 Install Concrete - Curb Ramp EA 8 8,000$ $64,000 <br />2 Install Concrete - Median Curb CY 27 1,500$ $40,500 <br />3 Install Concrete - Truck Apron Curb CY 13 1,500$ $19,500 <br />4 Install Concrete - Curb and Gutter CY 13 1,080$ $14,040 <br />5 Install Concrete - Sidewalk CY 21 1,040$ $21,840 <br />6 Install Concrete - Textured Pavment CY 38 1,130$ $42,940 <br />7 Install Concrete - Truck Apron CY 8 1,860$ $14,880 <br />8 Roadway Excavation CY 191 260$ $49,660 <br />9 Remove Concrete CY 38 400$ $15,200 <br />10 Hot Mix Asphalt TON 76 345$ $26,220 <br />11 Slurry TON 36 790$ $28,440 <br />12 Base Repair (HMA) ****TON 145 345$ $50,025 <br />13 CL2 Aggregate Base CY 85 180$ $15,300 <br />14 Signing and Striping LS 1 5,000$ $5,000 <br />15 Centerline Hardening EA 4 5,000$ $20,000 <br />16 Bus Stop Improvements EA 2 30,000$ $60,000 <br />17 Signal Modification EA 1 $250,000 $250,000 <br />$$773377,,554455 <br />18 Minor Items (15% of Items 1-17) **LS 1 $111,000 $111,000 <br />$$884488,,554455 <br />19 Mobilization (10% of Items 1-18)LS 1 $85,000 $85,000 <br />$$993333,,554455 <br />$326,800 <br />$1,260,345 <br />$$11,,226600,,334455 <br />$$4400,,000000 <br />$$11,,330000,,334455 <br />*Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />**Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />***This feasibility level estimate includes a 35% contingency intended to compensate for the use of preliminary and limited information. <br />****8% of project area is assumed to require Base Repair <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. Utility improvements such as water, <br />communication, gas, etc. are not included in these estimates. <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />CONTINGENCY (35%) *** <br />CONSTRUCTION SUBTOTAL <br />GGRRAANNDD TTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruu ccttiioonn EEaasseemmeenntt**== <br />GGRRAANNDD TTOOTTAALL <br />SSaa nntt aa AA nnaa VViissiioonn ZZ ee rroo <br />DDyyeerr RR dd aanndd FFlloowwee rr SStt IInntteerrssee cc tt iioonn <br />((IInntteerrsseeccttiioonn SSaaffeettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: PPrrootteecctteedd CCoorrnneerrss,, DDiirreeccttiioonnaall CCuurrbb RRaammppss,, CCeenntteerrlliinnee HHaarrddeenniinngg,, CCllaassss IIII//IIIIII BBiikkee FFaacciilliittiieess,, BBiikkee <br />CCrroossssiinnggss,, aanndd CCoonnfflliicctt SSttrriippiinngg)) <br />SSUUBBTTOOTTAALL <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />RROOAADDWWAAYY <br />EELLEECCTTRRIICCAALL <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />Santa Ana Vision Zero Estimate <br />  <br />  <br />City Council 32 – 222 6/4/2024