|
110
<br />#6. Grand Avenue
<br />Century High School to Edinger Avenue
<br />Existing Conditions and Recommendations
<br />Grand Avenue from Century High School to Edinger Avenue is a
<br />one-third mile stretch running north to south at the southeast edge of
<br />the City with Century High School on the east side of the street and
<br />light industry on the west side of the street. Light commercial retail
<br />is located at the intersection with Edinger Avenue. A moderate level
<br />of traffic and collisions occur on this stretch with one severe injury at
<br />the intersection with Edinger Avenue during the study period. A high
<br />quality pedestrian network of sidewalks, curb ramps, and bus stops
<br />run along the street to support pedestrian mobility but no bicycle
<br />facilities exist. High visibility crosswalks are missing. Figure 6-7 shows
<br />recommended improvements that could be extended farther along
<br />the route.
<br />0 0.5 10.25 Miles
<br />Project Location
<br />Serious Injuries and Fatalities between 2017-2021
<br />0
<br />Pedestrian
<br />0 2
<br />Bicycle Vehicle
<br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))****
<br />44,,556688,,776699$$ 55,,555588,,660077$$
<br />221100,,000000$$ 225555,,449977$$
<br />44,,777799,,000000$$ 55,,881155,,000000$$
<br />660000,,000000$$ 773300,,000000$$
<br />884400,,000000$$ 11,,003300,,000000$$
<br />110000,,000000$$ 113300,,000000$$ CM991100,,000000$$ 11,,111100,,000000$$
<br />22,,445500,,000000$$ 33,,000000,,000000$$
<br />77,,225500,,000000$$ 88,,885500,,000000$$
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were
<br />made.
<br />PPSS&&EE ((1177..55%%))
<br />RRIIGGHHTT OOFF WWAAYY ((22%%))
<br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%))
<br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT
<br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT
<br />SS aannttaa AAnnaa VViissiioonn ZZeerroo
<br />GGrraanndd AAvv ee ((CCeennttuurryy HHSS -- EEddiinnggeerr AAvvee))
<br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt))
<br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE
<br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT
<br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT
<br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS
<br />PPAA//EEDD ((1122..55%%))DESIGNSanta Ana Vision Zero Summary
<br />See Appendix D for a detailed breakdown of all cost estimates.
<br />
<br />
<br />City Council 32 – 115 6/4/2024
|