Laserfiche WebLink
110 <br />#6. Grand Avenue <br />Century High School to Edinger Avenue <br />Existing Conditions and Recommendations <br />Grand Avenue from Century High School to Edinger Avenue is a <br />one-third mile stretch running north to south at the southeast edge of <br />the City with Century High School on the east side of the street and <br />light industry on the west side of the street. Light commercial retail <br />is located at the intersection with Edinger Avenue. A moderate level <br />of traffic and collisions occur on this stretch with one severe injury at <br />the intersection with Edinger Avenue during the study period. A high <br />quality pedestrian network of sidewalks, curb ramps, and bus stops <br />run along the street to support pedestrian mobility but no bicycle <br />facilities exist. High visibility crosswalks are missing. Figure 6-7 shows <br />recommended improvements that could be extended farther along <br />the route. <br />0 0.5 10.25 Miles <br />Project Location <br />Serious Injuries and Fatalities between 2017-2021 <br />0 <br />Pedestrian <br />0 2 <br />Bicycle Vehicle <br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))**** <br />44,,556688,,776699$$ 55,,555588,,660077$$ <br />221100,,000000$$ 225555,,449977$$ <br />44,,777799,,000000$$ 55,,881155,,000000$$ <br />660000,,000000$$ 773300,,000000$$ <br />884400,,000000$$ 11,,003300,,000000$$ <br />110000,,000000$$ 113300,,000000$$ CM991100,,000000$$ 11,,111100,,000000$$ <br />22,,445500,,000000$$ 33,,000000,,000000$$ <br />77,,225500,,000000$$ 88,,885500,,000000$$ <br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />PPSS&&EE ((1177..55%%)) <br />RRIIGGHHTT OOFF WWAAYY ((22%%)) <br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%)) <br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT <br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT <br />SS aannttaa AAnnaa VViissiioonn ZZeerroo <br />GGrraanndd AAvv ee ((CCeennttuurryy HHSS -- EEddiinnggeerr AAvvee)) <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE <br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT <br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT <br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS <br />PPAA//EEDD ((1122..55%%))DESIGNSanta Ana Vision Zero Summary <br />See Appendix D for a detailed breakdown of all cost estimates. <br />  <br />  <br />City Council 32 – 115 6/4/2024