Laserfiche WebLink
SANTA ANA VISION ZERO PLAN <br />RECOMMENDED ENGINEERING IMPROVEMENTS <br />111Wilshire AveGrand Ave <br />Add high visibility continental crosswalks <br />with stop bar 5 ft behind crosswalk <br />Add crossbikes <br />Add truck aprons at both corners with <br />directional wheelchair ramps <br />Add bike-friendly bus stop based <br />on roadway and bikeway <br />configurations. See section <br />6.1.9 for available typologies. <br />Add yellow reflective <br />border on signal heads <br />on all four approaches <br />Grand Ave <br />Edinger AveBorchard AveAdd high visibility continental crosswalks <br />with stop bar 5 ft behind crosswalk <br />Add curb refuge islands with truck <br />aprons at corners or curb extensions <br />with directional wheelchair ramps Add raised Type <br />C curb on yellow <br />divider line <br />Add hardened <br />centerline in front <br />of median <br />Add crossbikes <br />Include bicycle/pedestrian <br />friendly signal timing, such <br />as LPIs, if possible. <br />Add bike-friendly bus stop <br />based on roadway and bikeway <br />configurations. See section <br />6.1.9 for available typologies. <br />Add high visibility continental <br />crosswalks with stop bar 5 ft behind <br />crosswalk <br />Add <br />crossbikes <br />Add truck aprons at both corners <br />with directional wheelchair ramps <br />KTU+A <br />3916 Normal St <br />San Diego, CA 92103 Santa Ana Vision Zero Plan <br />Conceptual Site PlanConceptual Site Plan Scale: 1" = 50'-0" <br />January 2024 <br />Grand Ave from Century High School to Edinger AveMATCHLINE SEE UPPER RIGHTMATCHLINE SEE LOWER LEFTLandscaped Areas <br />Multi-use Path <br />Bike Lane Marking <br />Bike Crossing <br />Markings <br />High Visibility <br />Crosswalk <br />Lane divider and/or <br />c-curb divider <br />Road Striping <br />High Visibility School <br />Crosswalk <br />Bike Sharrow <br />Marking <br />DISCLAIMER NOTE: All <br />improvements shown in concept <br />plans are subject to further <br />evaluation. <br />Note: All driveways with bike lanes or separated bike lanes to <br />receive driveway treatments in the form of 'continuous sidewalks' <br />or rubber humps. See details page for more information. <br />Figure 6-7: Grand Avenue from Edinger Avenue to Century High School Recommendations END PROJECTBEGIN PROJECT  <br />  <br />City Council 32 – 116 6/4/2024