Laserfiche WebLink
112 <br />#7. Fairview Street <br />Edinger Avenue to St. Andrew Place <br />Existing Conditions and Recommendations <br />Fairview Street from Edinger Avenue to St. Andrew Place is a one- <br />third mile stretch running north to south near the middle of the west <br />edge of the City. The Santa Ana College of Continuing Education and <br />Centennial Park is on the west side of the corridor and single family <br />housing and a grocery store on the east side. As a primary through- <br />road, it sees a daily large volume of traffic and high collisions rate with <br />two severe injuries at the intersection with Edinger Avenue during <br />the study period. A high quality pedestrian network of sidewalks, <br />curb ramps, and bus stops run along the street to support pedestrian <br />mobility but no bicycle facilities exist. High visibility crosswalks are <br />missing. Figure 6-8 shows recommended improvements that could <br />be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />0 0.5 10.25 Miles <br />Serious Injuries and Fatalities between 2017-2021 <br />1 <br />Pedestrian <br />0 2 <br />Bicycle Vehicle <br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))** <br />33,,555522,,999944$$ 44,,332222,,776600$$ <br />440000,,000000$$ 448866,,666611$$ <br />33,,995533,,000000$$ 44,,881100,,000000$$ <br />550000,,000000$$ 661100,,000000$$ <br />770000,,000000$$ 886600,,000000$$ <br />8800,,000000$$ 110000,,000000$$ CM776600,,000000$$ 993300,,000000$$ <br />22,,004400,,000000$$ 22,,550000,,000000$$ <br />66,,000000,,000000$$ 77,,335500,,000000$$ <br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT <br />SS aannttaa AAnnaa VViissiioonn ZZeerroo <br />FFaaiirrvviieeww SStt ((EEddiinnggeerr AAvvee -- SStt AAnnddrreeww PPll)) <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE <br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT <br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT <br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS <br />PPAA//EEDD ((1122..55%%))DESIGN* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />PPSS&&EE ((1177..55%%)) <br />RRIIGGHHTT OOFF WWAAYY ((22%%)) <br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%)) <br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT <br />Santa Ana Vision Zero Summary <br />  <br />  <br />City Council 32 – 117 6/4/2024