Laserfiche WebLink
City of Santa Ana, CA Page 2 <br />2024 Citywide Pavement Management Plan – OCTA Submittal <br />Final Report – May 27, 2024 <br /> <br /> <br />I. Pavement Management Plan Certification <br /> <br />The City of Santa Ana, CA certifies that is has a Pavement Management Plan in conformance with the <br />criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires <br />that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues <br />generated from renewed Measure M (M2). <br /> <br />The plan was developed by Bucknam Infrastructure Group, Inc. using StreetSaver, a pavement <br />management system conforming to American Society for Testing and Materials (ASTM) Standard D6433, <br />and contains, at a minimum, the following elements: <br /> <br />• Inventory of MPAH and Local routes reviewed and updated biennially. The last update of the <br />inventory was completed on April, 2024 for the Arterial (MPAH) and April, 2024 for the Local <br />streets; <br />• Assessment of the pavement condition for all routes in the system, updated biennially. The last <br />field review of the pavement condition was completed in April, 2024; <br />• Percentage of all section of pavement needing: <br />o Preventive Maintenance = 28.0%; <br />o Rehabilitation = 26.1%; <br />o Reconstruction = 5.3% <br />• Budget needs for preventive maintenance, rehabilitation and/or reconstruction of deficient <br />sections of pavement for: <br />o Current biennial period $39,968,540; <br />o following biennial period $41,047,100; <br />• Funds budgeted or available for Preventive Maintenance, Rehabilitation and/or Reconstruction. <br />o Current biennial period $39,968,540; <br />o following biennial period $39,520,540; <br />• Backlog by year of unfunded rehabilitation, restoration and reconstruction needs (see page 9); <br /> <br />• The Pavement Management Plan is consistent with countywide pavement condition assessment <br />standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted <br />by the OCTA Board of Directors. <br /> <br />*An electronic copy of the Pavement Management Plan (with MicroPAVER or StreetSaver compatible <br />files) has been or will be submitted with the certification statement. A copy of this certification is being <br />provided to the Orange County Transportation Authority. <br /> <br />Submitted by: <br /> <br />__ ______City of Santa Ana <br />Name (Print) Jurisdiction <br /> <br />_____________________________ ______________ <br />Signed Date <br /> <br />Deputy Public Works Director/City Engineer <br />Title