My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 33 - Measure M2 Funding Eligibility 2024 Renewal (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 33 - Measure M2 Funding Eligibility 2024 Renewal (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 12:16:53 PM
Creation date
6/4/2024 12:11:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
33
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, CA Page 18 <br />2024 Citywide Pavement Management Plan – OCTA Submittal <br />Final Report – May 27, 2024 <br /> <br /> <br />For systematic re-inspections, this could be due to noticed trends such as specific treatment types <br />(e.g. open-graded mixed), a specific inspector or geographical area. In these cases Bucknam <br />continues to utilize a 10% re-inspection policy. <br />e. PCI Comparison with Past Surveys - if previous inspection data is available, new PCI’s calculated <br />through the most recent inspections will be compared to previous PCI’s. If the variance in PCI is <br />greater than +/- 10 PCI points, these sections will be flagged for further investigation and/or re- <br />inspection (In the cases that a PCI increases or decreases by 10 points follows the established <br />CPMPG guidelines; Appendix A, page A-18). <br />f. Schedule of data submittal – Pending on the City’s last major PMP submittal, Bucknam will assist <br />the agency in submitting the following: <br /> Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least <br />once every two years <br /> Local streets will be surveyed and reported on every six years <br /> Corresponding MPAH and local PCI reporting and budgetary reporting will be submitted <br />every two years <br />g. Experience of Inspectors – Bucknam staff have been trained on the use of StreetSaver and the <br />segment calibration/verification and inspection practices. Mr. Peter Bucknam (Project Manager) <br />has completed the MicroPAVER Certification of Professional Development courses. All Bucknam <br />field technicians are trained using the ASTM D6433 survey methodologies and have passed <br />OCTA’s prequalification testing every year since 2010. Bucknam Infrastructure Group inspectors <br />have attended formal training on pavement condition distress surveys. This training was <br />conducted prior to performing any work using the ASTM D6433 protocols, consistent with <br />OCTA’s requirements. <br /> <br />h. Field data collection safety procedures – Bucknam field survey techniques utilize the following <br />procedures: <br />a. All vehicles are properly marked or flagged with appropriate sign markings indicating that <br />a “PAVEMENT SURVEY IS IN PROGRESS”; <br />b. All vehicles have the proper flashing amber light beacons placed on the top of the vehicle <br />to allow for proper visibility and line-of-site warning; <br />c. Large MPAH routes are surveyed using two field technicians to increase traffic control <br />warning and safety; <br />d. While parking or stopping along the survey route, vehicles legally park within the right- <br />of-way or use a parking lot; <br />e. All field technicians wear ANSI – 105 Class II safety vests <br />
The URL can be used to link to this page
Your browser does not support the video tag.