My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 33 - Measure M2 Funding Eligibility 2024 Renewal (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 33 - Measure M2 Funding Eligibility 2024 Renewal (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 12:16:53 PM
Creation date
6/4/2024 12:11:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
33
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, CA Page 19 <br />2024 Citywide Pavement Management Plan – OCTA Submittal <br />Final Report – May 27, 2024 <br /> <br /> <br />XV. APPENDIX E – PAVEMENT MANAGEMENT DATA FILES <br /> <br />The City of Santa Ana StreetSaver database is available online through MTC StreetSaver’s website; to log <br />in and review PMP data OCTA will need to obtain permission from Santa Ana staff and MTC. Available <br />PMP data and the associated reporting data includes: <br /> <br />• Street names and limits for the City’s public streets <br />• Street identifiers (Branch ID, Section ID) <br />• Direction <br />• Begin and end of section <br />• Length, width and true areas <br />• Functional Classification (MPAH, Local) <br />• Number of travel lanes <br />• Pavement Condition Index (PCI) and date of inspection <br />• Type of recommended treatment <br />• Cost of recommended treatment <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.