Laserfiche WebLink
ACCOUNT UNIT ADOPTED <br />FY 23-24 FEES <br />PROPOSED <br />FY 24-25 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2024-2025 FEE SCHEDULE <br />SECTION X <br />MISCELLANEOUS FEE <br />Electrical Fees <br />51603 165)Permit Issuance 63.90 66.88 <br />51603 166)Minimum Fee (Nonresidential)85.19 89.16 <br />53601 167)Electrical Plan Check Fee (when required)65% of Subtotal 65% of Subtotal <br />51603 168)125 Volt Receptacle Outlets 1.69 1.77 <br />51603 169)Light Switches, Occupancy Sensors 1.83 1.92 <br />51603 170)Light Fixtures 1.22 1.28 <br />51603 171)Air Conditioners, Heat Pumps 112.48 117.72 <br />51603 172)Factory-Wired Units (Solid Hook-Ups)28.77 30.11 <br />51603 173)Dedicated Circuits (15 or 20 AMP Receptacles)28.77 30.11 <br />51603 174)Time Clock, Photo-Cell, Time Switch 14.04 14.69 <br />51603 175)Track-Light, Cable Tray, Special Raceway, Plugmold, 28.77 30.11 <br /> Under-Floor Duct, Plug-In Busways, Wiremold, Etc. <br /> Service Meter, Reset Meter, Subpanel, Switchboard, Motor <br /> Control Center, Transfer Switch, Busduct, or other Distribution <br /> Equipment changes or modifications. <br />Each 100 ft. <br />or fraction thereof <br />Page 76 of 151