Laserfiche WebLink
<br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Alley Improvement Program This project will provide for the removal of existing damaged <br />pavement and reconstruction with Portland Cement Concrete (PCC) <br />for alleys citywide. <br />The Citywide network of Portland Cement Concrete (PCC) and asphalt <br />alleys is in extreme state of deterioration with the presence of <br />numerous potholes, cracking, spalling, and uplifting. PCC pavement will <br />eliminate the drainage problems associated with the asphalt pavement <br />and provide a longer life for the alleys. <br />PROJECT CATEGORY: <br />Street Improvements <br />Alley Rehabilitation <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 24/25 <br />1,389,000 <br />111,000 <br />FY 25/26 <br />1,458,000 <br />117,000 <br />FY 26/27 <br />1,531,000 <br />123,000 <br />FY 27/28 <br />1,608,000 <br />129,000 <br />FY 28/29 <br />1,688,000 <br />135,000 <br />FY 29/30 <br />1,772,000 <br />142,000 <br />FY 30/31 <br />1,861,000 <br />149,000Engineering <br />TOTAL 1,500,000 1,575,000 1,654,000 1,737,000 1,823,000 1,914,000 2,010,000 <br />CITYWIDE <br />SOURCE OF FUNDS FY 24/25 <br />1,500,000 <br />1,500,000 <br />FY 25/26 <br />1,575,000 <br />1,575,000 <br />FY 26/27 <br />1,654,000 <br />1,654,000 <br />FY 27/28 <br />1,737,000 <br />1,737,000 <br />FY 28/29 <br />1,823,000 <br />1,823,000 <br />FY 29/30 <br />1,914,000 <br />1,914,000 <br />FY 30/31 <br />2,010,000 <br />2,010,000 <br />GENERAL FUND <br />TOTAL <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer <br />15