My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 40 - Public Hearing Fiscal Year 2024-25 Budget (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 40 - Public Hearing Fiscal Year 2024-25 Budget (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 12:22:10 PM
Creation date
6/4/2024 12:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
40
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1042
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Bedford Rd Rehab: Main Place to <br />North City Limit <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective roadway <br />repairs, and maximize the return from available funding for street <br />pavement. This segment of Bedford Road pavement rehabilitation is <br />identified as a high priority in the PMP.PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />PROJECT COSTS FY 24/25 <br />173,000 <br />173,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction ------ <br />TOTAL ------ <br />SOURCE OF FUNDS FY 24/25 <br />173,000 <br />173,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />RMRA SB1 ------ <br />TOTAL ------ <br />AGENCY:DIVISION:CONTACT: <br />Public Works Design Engineering Gilbert Castillo, Senior Engineer <br />16
The URL can be used to link to this page
Your browser does not support the video tag.