My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RINCON CONSULTANTS, INC. (8)
Clerk
>
Contracts / Agreements
>
R
>
RINCON CONSULTANTS, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 8:26:14 AM
Creation date
6/18/2024 8:26:10 AM
Metadata
Fields
Template:
Contracts
Company Name
RINCON CONSULTANTS, INC.
Contract #
A-2024-074
Agency
Community Development
Council Approval Date
6/4/2024
Expiration Date
6/30/2027
Insurance Exp Date
2/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Services Provided and implementation Schedule/Proposed Work Plan <br /> • Task 4- Public Review Draft IS-MND. Rincon will typically deliver the Public Review Draft IS-MND within <br /> one to two weeks of receipt of comments on the Administrative Draft IS-MND.The Public Review Draft EIR <br /> will circulate for a period of 20 to 30 days.Rincon will also assist with preparing and filing the NOI, NOC,and <br /> Summary Form with the State Clearinghouse(SCH)and the NOI with the County Clerk. <br /> • Task 5- Final IS-MND.Rincon will prepare written responses and submit them to staff for review within one <br /> to two weeks of receipt of all comments received by close of the public review period. Corrections will be <br /> made as necessary, and a final set of responses will be provided to enclose with the Final IS-MND to be <br /> considered for approval. The Final IS-MND will typically be provided within one week of receipt of all City <br /> comments regarding the responses,The Final IS-MND will be in the form of a single document that includes <br /> the Draft IS-MND,mitigation measures and MMRP as well as all agency and public comments and responses <br /> to comments. If desired,we can also prepare CEQA findings for the project in conjunction with the Final IS- <br /> MND. Once the Final IS-MND is approved,and within five days of said approval, Rincon will assist with the <br /> preparation and filing of the NOD and filing fees with the SCH and County Clerk. <br /> EIR Process <br /> • Task 1- Kickoff Meeting,A kickoff meeting will typically be held within two weeks of the notice-to-proceed <br /> with City staff to confirm study objectives and approaches,communication protocol,and schedule. <br /> • Task 2-EIR Project Description. Rincon will prepare a description of the project being analyzed,including <br /> its site and existing conditions, project characteristics relevant to the EIR analysis, project objectives,and <br /> required discretionary approvals.This typically includes textual,tabular,and graphic presentation. <br /> • Task 3-IS-NOP.Rincon will prepare an IS checklist with supporting discussion,typically within four weeks. <br /> The IS will cover all Items on the City's environmental checklist and will include facts and analysis to support <br /> all conclusions.Upon City approval of the IS,we will circulate the IS and NOP of a Draft EIR for public review. <br /> • Task 4- EIR Seeping Meeting.If required,a seeping meeting will be held during the 30-day NOP period to <br /> introduce the community to the proposed project and obtain input on the EIR scope of work(note:scoping <br /> meetings are required only for"regionally significant" projects). <br /> • Task 5-Administrative Draft EIR.Rincon will prepare an Administrative Draft ElR within six to eight weeks <br /> of release of the NOP.The EIR will Include the following <br /> o Executive Summary.Summary of the proposed project and associated environmental consequences <br /> presented in tabular format to simplify review by decision-makers and the public. <br /> o Introduction and Environmental Setting. Introductory sections (required by CEQA) that lay the <br /> groundwork for and summarize the substantive analysis to follow; the introduction describes the <br /> purpose and legal authority of the study, and provide a discussion of lead, responsible and trustee <br /> agencies;and the environmental setting provides a general description of the existing urban geographic <br /> character of the city and the site vicinity. <br /> o Environmental Impact Analysis.Analysis of impacts determined in the IS to be potentially significant; <br /> includes four main components: <br /> - Setting. Description of current conditions with respect to the issue in question, including the <br /> existing regulatory environment. <br /> - Impact Analysis. Discussion of potentially significant effects of the proposed project, Impacts are <br /> typically compared to established"thresholds of significance." <br /> - Mitigation Measures.Methods by which significant effects can be reduced or eliminated. <br /> - Level of Significance after Mitigation. Discussion of whether proposed mitigation measures <br /> reduce impacts to below the adopted significance threshold. <br /> - Other CEQA-Required Discussions. Ellis also include other discussions required by the CEQA <br /> Guidelines, including an analysis of potential growth-inducing Impacts, a listing of significant <br /> irreversible changes,and a discussion of areas of public controversy. <br /> - Alternatives.See alternatives discussion following"Approach To NEPA Document Preparation." <br /> • Task 6 - Draft EIR.Ninon will incorporate City comments and complete the Draft EIR,typically within two <br /> to three weeks.The Draft El R will circulate for a period of 30 to 45 days. Rincon will also assist with preparing <br /> and filing the NOA,NOC,and Summary Form with the SCH and the NOA with the County Clerk. <br /> • Task 7 - Final EIR. Rincon will complete the Final EIR after the receipt of all written comments received <br /> during the review period.The Final Elk will consist of the comments,responses,and corrections to the Draft <br /> • Rincon Consultants, Inc. 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.