My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RINCON CONSULTANTS, INC. (8)
Clerk
>
Contracts / Agreements
>
R
>
RINCON CONSULTANTS, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 8:26:14 AM
Creation date
6/18/2024 8:26:10 AM
Metadata
Fields
Template:
Contracts
Company Name
RINCON CONSULTANTS, INC.
Contract #
A-2024-074
Agency
Community Development
Council Approval Date
6/4/2024
Expiration Date
6/30/2027
Insurance Exp Date
2/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br /> On-call Environmental Review Services for Housing Division <br /> EIR (if any are warranted), and the MMRP. If desired and required,we will also prepare CEQA Findings and <br /> a Statement of Overriding Consideration for the project. <br /> o Response to Comments.Within two to three weeks of receipt of all comment letters on the Draft EIR, <br /> Rincon will submit draft Response to Comments. Within one week of receipt of City comments on the <br /> draft report, Rincon will prepare the final Response to Comments. <br /> o MMRP.Concurrent with the Responses to Comments report, Rincon will prepare an MMRP, which will <br /> be included in the Final EIR. <br /> o NOD. Within five days of EIR certification and project approval (if any), Rincon will assist with the <br /> preparation and filing of the NOD with the County Clerk and SCH along with the filing fee(to be paid by <br /> the project applicant). <br /> Approach to NEPA Document Preparation <br /> Upon receiving an inquiry from the City on a particular project with federal agency involvement,an early step will <br /> be determining what level of NEPA review will be required.Rincon's project manager will obtain a detailed project <br /> description from the City staff members and consider the location, scale, and implementation timeframe. <br /> Preliminary research on the site will be conducted, and existing technical studies and environmental <br /> documentation will be consulted. The following are typical procedures for an EA/FONSI and EIS. For tasks <br /> involving City review, Rincon estimates a period of 15 days for the City to complete a round of review. <br /> EA/FONSI Process <br /> • Task 1- Kickoff Meeting.Similar to IS-MND process. <br /> • Task 2 -Administrative Draft EA/FONSI.The Administrative Draft EA/FONSI will be provided within six to <br /> eight weeks of receipt of notice to proceed and approval of the project description. <br /> • Task 3 - Public Review Draft EA/FONSI. Rincon will deliver the Public Review Draft EA/FONSI within one <br /> to two weeks of receipt of City comments on the Administrative Draft EA/FONSI. <br /> • Task 4 - Final EA/FONSI. Rincon will prepare written responses and submit them to City staff for review <br /> within seven days of receipt of all comments received after the closing of the public review period.The Final <br /> EA/FONSI will be provided within one week of receipt of all comments regarding the responses. <br /> EIS Process <br /> • Task 1- NOI and Scoping Process.Similar to EIR process. <br /> • Task 2 -Scoping Meeting.Similar to EIR process. <br /> • Task 3-Description of Project Alternatives.Similar to EIR process,except all potential alternatives will be <br /> described in an equal level of detail,as required by NEPA. <br /> • Task 4-Administrative Draft EIS.Similar to EIR process except all potential alternatives will be analyzed <br /> at an equal level of detail,as required by NEPA. <br /> • Task 5- Draft EIS.Similar to EIR process. <br /> • Task 6 - Final EIS <br /> o Responses to Comments/Preliminary Final EIS.Similar to EIR process. <br /> o Final EIS Publication. NEPA requires a 30-day review period for a Final EIS. The EIS will need to be <br /> made available for an additional 30-day review period following its publication. <br /> • Task 7-Record of Decision(ROD).The ROD will be issued no sooner than 30 days after the approved Final <br /> EIS is distributed or 90 days after the Draft EIS is circulated. <br /> We also have experience preparing Categorical Exclusions for capital improvement projects and small residential <br /> projects. Categorical Exclusions we have prepared for the City have typically consisted of street improvements <br /> (e.g.,sidewalk replacements,ADA-curb ramp installations)or other public facility improvements(e.g., parks and <br /> libraries).The process and document for a Categorical Exclusion is akin to an abbreviated EA/FONSI,which can <br /> be typically completed within six to eight weeks. Historically, the City has managed all NEPA notices; however, <br /> Rincon can also assist with the preparation and posting of the Notice of Intent to Request Release of Funds <br /> (NOI/RROF)and subsequent RROF. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.