My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J & L CONSTRUCTORS INC.
Clerk
>
Contracts / Agreements
>
J
>
J & L CONSTRUCTORS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:52:46 AM
Creation date
6/18/2024 10:52:39 AM
Metadata
Fields
Template:
Contracts
Company Name
J & L CONSTRUCTORS INC.
Contract #
A-2024-069-01
Agency
Public Works
Council Approval Date
5/21/2024
Expiration Date
5/20/2027
Insurance Exp Date
12/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 5 -PCC Curb & Gutter(A-2-8) <br /> The work under this item consists of grading, compacting subgrade, constructing 12"wide by <br /> 12" deep AC Hot Mix on compacted subgrade, and constructing PCC Curb &Gutter(outside of <br /> the curb ramp footprint, beyond the BCR or ECR) in accordance with the provisions of Section <br /> 301-1,"Subgrade Preparation,"and Section 303-5, "Concrete Curbs, Walks, Gutters, Cross <br /> Gutters,Alley Intersections,Access Ramps, and Driveways" and any City Standard <br /> Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the <br /> City for each Task Order. <br /> Payment for PCC Curb & Gutter(A-2-8) shall be at the contract unit price bid per Linear Foot <br /> as listed in the Fee Proposal, and shall include full compensation for doing all work, including <br /> furnishing all materials, labor, equipment,tools, and incidentals as required and no additional <br /> compensation will be allowed therefore. <br /> Item No. 6- Signing & Striping <br /> The work under this item for Signing and Striping shall be in accordance with the latest CA <br /> MUTCD, Caltrans and any City Standard Specifications,plans, and/or any City's Special <br /> Provisions/Contract Documents to be provided for each Task Order Work. <br /> Payment for Signing & Striping shall be at the contract Lump Sum listed in the Fee Proposal, <br /> and shall include full compensation for doing all work, including furnishing all materials, labor, <br /> equipment,tools, disposal of all removed materials and incidentals as required and no additional <br /> compensation will be allowed therefore. <br /> Item No. 7—Traffic Control <br /> The work under this item for Signing and Striping shall be in accordance with the latest Watch <br /> Manual, CA MUTCD, Caltrans and any City Standard Specifications,plans,and/or any City's <br /> Special Provisions/Contract Documents to be provided for each Task Order Work. <br /> Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in <br /> the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br /> materials, labor, equipment,tools, and incidentals as required and no additional compensation <br /> will be allowed therefore. <br /> City of Santa Ana RFP 23-182 <br /> Page Al-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.