Laserfiche WebLink
Sample Task Order B Items of Work <br /> Item No. 1 - Unclassified Excavation <br /> Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in <br /> the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br /> materials, labor, equipment,tools, and incidentals as required and no additional compensation <br /> will be allowed therefore. <br /> Payment for unclassified fill, if any, is considered as included in the unit price paid for <br /> unclassified excavation. <br /> Payment for over-excavation shall be paid for at the unit price for unclassified excavation. <br /> Item No. 2 -PCC Sidewalk(T=4") <br /> The work under this item consists of grading, compacting subgrade, and constructing 4-inch <br /> thick PCC Sidewalk shall be in accordance with the provisions of Section 301-1,"Subgrade <br /> Preparation," and Section 303-5, "Concrete Curbs, Walks, Gutters, Cross Gutters,Alley <br /> Intersections,Access Ramps, and Driveways,"of the Standard Specifications, plans, and contract <br /> document specifications. <br /> Payment for PCC Sidewalk(T=4") shall be at the contract unit price bid per Square Foot as <br /> listed in the Fee Proposal, and shall include full compensation for doing all work, including <br /> furnishing all materials, labor,equipment,tools, and incidentals as required and no additional <br /> compensation will be allowed therefore. Payment for thickness(T=6") shall be paid 1.5 times the <br /> unit price. <br /> Item No.3-PCC Curb Ramp <br /> The work under this item consists of saw-cutting,removing, grading, compacting subgrade, <br /> constructing 12"wide by 12"deep AC Hot Mix on compacted subgrade, and constructing PCC <br /> Curb& Gutter and shall be in accordance with the provisions of Section 301-1, "Subgrade <br /> Preparation," and Section 303-5,"Concrete Curbs,Walks, Gutters, Cross Gutters,Alley <br /> Intersections,Access Ramps, and Driveways" and any City Standard Specifications,plans, <br /> and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br /> Order. <br /> Payment for PCC Curb Ramp shall be at the contract unit price bid per Square Foot as listed in <br /> the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br /> materials, labor, equipment,tools, and incidentals as required and no additional compensation <br /> will be allowed therefore. The area included in this bid item shall be measured from the gutter lip <br /> to the back of walk, from BCR to ECR. <br /> Item No. 4 -PCC Curb & Gutter(A-2-8) <br /> City of Santa Ana RFP 23-182 <br /> Page Al-8 <br />