Item No. 8—Remove and Replace 30" Reinforced Concrete Pipe
<br /> The work under this item consists of grading, compacting subgrade, and constructing Remove
<br /> and Replace 30" Reinforced Concrete Pipe and shall be in accordance with the provisions of
<br /> Section 306, "Underground Conduit Construction"and any City Standard Specifications,plans,
<br /> and/or any City's Special Provisions/Contract Documents provided by the City for each Task
<br /> Order.
<br /> Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit
<br /> price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for
<br /> doing all work, including removal or replacement of existing pipe, furnishing all materials, labor,
<br /> equipment,tools, and incidentals as required to install new pipe, bedding preparation, and no
<br /> additional compensation will be allowed therefore.
<br /> Item No. 9—Guard Rail Replacement(Caltrans RSP A77N4)
<br /> The work under this item consists of grading, compacting subgrade, and constructing Guard Rail
<br /> Replacement(Caltrans RSP A77N4)and shall be in accordance with the provisions of Section
<br /> 301-1, "Subgrade Preparation,"with the provisions of Section 204,"Lumber and Treatment with
<br /> Preservatives," Section 304-2.2"Flexible Metal Guard Rail," any City Standard Specifications,
<br /> plans, and/or any City's Special Provisions/Contract Documents provided by the City for each
<br /> Task Order.
<br /> Payment for Guard Rail Replacement (Caltrans RSP A77N4) shall be at the contract unit
<br /> price paid per Linear Foot as listed in the Fee Proposal,and shall include full compensation for
<br /> doing all work, including removal or replacement of existing guard rail, furnishing all materials,
<br /> labor, equipment,tools, and incidentals as required to install new guardrail, foundation
<br /> preparation,and no additional compensation will be allowed therefore.
<br /> Item No. 10-Guard Rail Replacement Termination (Caltrans)
<br /> The work under this item consists of grading, compacting subgrade, and constructing Guard Rail
<br /> Replacement Termination(Caltrans) and shall be in accordance with the provisions of Section
<br /> 301-1, "Subgrade Preparation,"with the provisions of Section 204, "Lumber and Treatment with
<br /> Preservatives," Section 304-2.2 "Flexible Metal Guard Rail," any City Standard Specifications,
<br /> plans, and/or any City's Special Provisions/Contract Documents provided by the City for each
<br /> Task Order.
<br /> Payment for Guard Rail Replacement Termination (Caltrans) shall be at the contract unit
<br /> price paid per Each as listed in the Fee Proposal, and shall include full compensation for doing
<br /> all work, including removal or replacement of existing guard rail termination, furnishing all
<br /> materials, labor, equipment,tools, and incidentals as required to install new guardrail
<br /> termination, foundation preparation, and no additional compensation will be allowed therefore.
<br /> Item No. 11—Remove and Replace Chain Link R/W Fence
<br /> City of Santa Ana RFP 23-182
<br /> Page Al-10
<br />
|