Laserfiche WebLink
Payment for Remove and Replace 18" Reinforced Concrete Pipe shall be at the contract unit <br /> price paid per Linear Foot as listed in the Fee Proposal,and shall include full compensation for <br /> doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, <br /> equipment,tools, and incidentals as required to install new pipe,bedding preparation, and no <br /> additional compensation will be allowed therefore. <br /> Item No. 5—Remove and Replace 30" Reinforced Concrete Pipe <br /> The work under this item consists of grading, compacting subgrade, and constructing Remove <br /> and Replace 30"Reinforced Concrete Pipe and shall be in accordance with the provisions of <br /> Section 306, "Underground Conduit Construction"and any City Standard Specifications,plans, <br /> and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br /> Order. <br /> Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit <br /> price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for <br /> doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, <br /> equipment,tools, and incidentals as required to install new pipe, bedding preparation, and no <br /> additional compensation will be allowed therefore. <br /> Item No. 6-Catch Basin (Type"B," W=10') <br /> The work under this item consists of grading, compacting subgrade, and constructing Catch <br /> Basin and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," <br /> and Section 303-1, "Concrete Structures"and any City Standard Specifications,plans, and/or <br /> any City's Special Provisions/Contract Documents provided by the City for each Task Order. <br /> Payment for Catch Basin (Type"B,"W=10') shall be at the contract unit price paid per Each as <br /> listed in the Fee Proposal, and shall include full compensation for doing all work, including <br /> removal or replacement of existing catch basins and/or other appurtenances,including furnishing <br /> all materials, labor, equipment, tools, and incidentals as required to construct a new catch basin, <br /> soil preparation and compaction, and no additional compensation will be allowed therefore. <br /> Item No. 7—Traffic Control <br /> The work under this item for Signing and Striping shall be in accordance with the latest Watch <br /> Manual, CA MUTCD, Caltrans and any City Standard Specifications,plans,and/or any City's <br /> Special Provisions/Contract Documents to be provided for each Task Order Work. <br /> Payment for Traffic Control shall be at the contract unit price per Lump Sum(LS) as listed in <br /> the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br /> materials, labor,equipment,tools, and incidentals as required and no additional compensation <br /> will be allowed therefore. <br /> City of Santa Ana RFP 23-182 <br /> Page A1-13 <br />