Laserfiche WebLink
Sample Task Order D Items of Work <br /> Item No. 1—Furnish and Install Streetlight Pole <br /> This work consists of furnishing and installing Ameron 4B 127 Street Light Pole including <br /> foundation, 2"PVC (stub out) conduits, Grout cap, 8' Clamp-On Arm Assembly, Overhead Pin <br /> &Insulator,LED Luminaire, 8-8 Bard Duplex Aluminum Conductor wiring, and any other work <br /> required to provide the intended operation at the locations shown on the project plans per City of <br /> Santa Ana Special Provisions and Standard Plans 1126H-3 and 1126H-2 and 1104. <br /> The unit price for each Street Light Pole shall be considered full compensation for furnishing all <br /> labor, materials,tools,equipment, removals, excavation, landscape repair,turf repair, hardscape <br /> repair, irrigation repair,root shaving, tree trimming, sidewalk restoration, and appurtenances for <br /> all related items of work necessary for the installation.No additional compensation will be <br /> allowed therefore. <br /> Item No. 2—Remove Existing Wooden Pole <br /> This work consists of removing and discarding Street Light Pole including luminaire arm, <br /> existing overhead wiring, and any other appurtenances. Salvage equipment as directed by <br /> Engineer. <br /> The unit price for each removed Street Light Pole shall be considered full compensation for all <br /> labor, materials,tools, equipment, removals, excavation,paving, landscape repair,turf repair, <br /> hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items <br /> of work necessary for the removal.No additional compensation will be allowed therefore. <br /> Item No. 3—Remove Existing Steel Pole <br /> This work consists of removing and discarding Street Light Pole including foundation, luminaire <br /> arm, overhead wiring, and any other appurtenances. Salvage equipment as directed by Engineer. <br /> The unit price for each removed Street Light Pole shall be considered full compensation for all <br /> labor, materials, tools, equipment, removals, excavation,paving, landscape repair,turf repair, <br /> hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items <br /> of work necessary for the removal.No additional compensation will be allowed therefore. <br /> Item No. 4—Install Electrical Meter Pedestal <br /> This work consists of furnishing and installing Electrical Meter Pedestal including foundation, <br /> circuit breakers,photocell, contactors, conduits,wiring, SCE coordination, electrical permit and <br /> any other work required to provide the intended operation at the location required per City of <br /> Santa Ana Special Provisions, Standard Plan 1126M and any approved Southern California <br /> Edison Design Plans. <br /> City of Santa Ana RFP 23-182 <br /> Page A1-14 <br />