Laserfiche WebLink
The unit price for each Install Electrical Meter Pedestal shall be considered full compensation for <br /> furnishing all labor, materials,tools, equipment, removals,paving, landscape repair, irrigation <br /> repair, root shaving, sidewalk restoration, and appurtenances for all related items of work <br /> necessary for the installation.No additional compensation will be allowed therefore. <br /> Item No. 5—Install 2" PVC Conduit <br /> This work consists of furnishing and installing Polyvinylchloride (PVC) street lighting conduit <br /> including pull tape, ground wire, fittings, duct seal, utility potholing, concrete or asphalt <br /> restoration and appurtenances complete and in place,of the size indicated on the plans. <br /> The unit price bid per linear foot of PVC Conduit shall be considered full compensation for <br /> furnishing all labor, materials,tools, equipment, removals,paving, landscape repair, irrigation <br /> repair, root shaving, sidewalk restoration, pothole and/or trench backfill per City Std. Plan 1150, <br /> permanent asphalt replacement, permanent PCC replacement, striping and appurtenances for all <br /> related items of work necessary for the installation.No additional compensation will be allowed <br /> therefore. <br /> Item No. 6—Install No. 5 Pull Box <br /> This work consists of furnishing and installing and/or replacing pull box including Concrete Lid, <br /> the removal and/or modification of any interfering portions of existing pull box, conduit, PCC, <br /> concrete and asphalt restoration, as indicated on plans and directed by the Engineer. <br /> The unit price for each Pull Box shall be considered full compensation for furnishing all labor, <br /> materials,tools, equipment, removals,paving, landscape repair, irrigation repair,root shaving, <br /> sidewalk restoration, and appurtenances for all related items of work necessary for the <br /> installation. No additional compensation will be allowed therefore. <br /> Item No. 7—Pothole Street Light Pole Location <br /> Payment for Pothole Street Light Pole Location shall be considered full compensation for <br /> furnishing all labor,materials,tools, equipment, removals, excavation,paving, landscape repair, <br /> irrigation repair, root shaving, sidewalk restoration,pothole and trench backfill per City Std. Plan <br /> 1150,permanent asphalt replacement,permanent PCC replacement and appurtenances for all <br /> related items of work necessary for the installation.No additional compensation will be allowed <br /> therefore. <br /> Item No. 8—Traffic Control Work <br /> The work under this item for Signing and Striping shall be in accordance with the latest Watch <br /> Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's <br /> Special Provisions/Contract Documents to be provided for each Task Order Work. <br /> City of Santa Ana RFP 23-182 <br /> Page Al-15 <br />