Laserfiche WebLink
97 <br /> <br />Item 4. The trenching~ furnishing and installation o <br />one snd one-quarter (l~) inch inside diameter sherm- <br />dized conduit containing two (2) #8 solid B. & S. <br />gauge varnished cambric lead covered cable, In$1uding <br />all grounds and connections as per plans and speclfl- <br />cations, and including repair of all sidewalk, curbs <br />and pavements and other improvements cut or damaged <br />during the construction, complete with the furnishing <br />of all necessary equipment, labor and material on an <br />estimate of 1,457 linear feet. <br /> <br />Item 5. The trenching, furnishing and installation o~ <br />two (2) inch inside diameter sheradized conduit con- <br />taining two (2) #8 solid B. & S. gauge varnished cam- <br />bric lead covered cable, including all grounds and <br />connections as per plans end specifications, and ln- <br />cludln~ repair of all sidewalk, curbs and pavements <br />and other improvements cut or damaged during the con- <br />struction, complete with the furnishing of all necess~ <br />equipment, labor and material on an estimate of 408 <br />linear feet./ <br /> <br />In Re <br /> <br />Resolution No. 1552 <br /> <br />Approving Assessment Diagram ' <br /> <br />S.Artesla,W.Walnut & W. Pine St.. <br /> <br />In Re <br /> <br />Resolution No. 1583 <br /> <br />Approving &ssessment Diagram <br /> <br />N. Garnsey Street. <br /> <br />Item 6. The trenching, furnishing and installation o~ <br />two (2) inch inside diameter sheradlzed conduit con- <br />t~ning four (4) #8 so]id B. & S. gauge varnished cam- <br />bric lead covered cable, including all grounds, and <br />connections as per plans and specifications, and in- <br />cluding repair of all sidewalks, curbs and pavements <br />and other improvements cut or damaged during the con- <br />.~truction, complete with the furnishing of al~ neces- <br />sary equipment, labor and material on an estimate of <br />~019 linear feet. <br /> <br />Item 1 Item 2 Item ~ Item 4 Item 5 Item 6 <br /> <br />Walker & Martin $289.00 <br />Harry M. Rouse 282.00 <br />Fritz Ziebarth 271.00 <br />Robertson ElectricCo.2?9.80 <br /> <br />$147.00 $0.45 $0.5V $0.75 $0.95 <br />142.00 0.40 0.53 0.61 0.93 <br />155.00 0.45 0.5? 0.75 0.95 <br />145.00 0.368 0.515 0.624 9.99 <br /> <br />The Board of Trustees thereupon awarded the contract to <br /> <br />Robertson Electric Company as the lowest responsible <br /> <br />bidder therefor at the prices named in their Bid. <br /> <br />Trustee Collier.introduced a resolution awerdlng <br /> <br />the contract to Robez~son Electric Company. The resolu- <br /> <br />tion was ordered filed, read, considered, designated <br /> <br />Resolution of Award No. 1551 and passed by the followin <br /> <br />vote: <br /> <br />Ayes: <br /> <br />Trustees C.H. Chapman, E.B. Collier, F.L. <br /> Purinton, J.W. Tubbs <br /> <br />Noes; Trustees None <br /> <br />Absent: Trustees Geo McPhee <br /> <br />Trustee Chapman introduced a resolution approving asses <br /> <br />ment diagram for work done an~ improvement made on So. <br /> <br />Artesia, W. Walnut and W. Pine Streets in accordance <br /> <br />with Resolution of Intention No. 1498. <br /> <br />The resolution was ordered filed, read, considered, <br /> <br />designated Resolution No. 1552, end passed by the follo~ <br /> <br />lng vote: <br /> <br />Ayes, Trustees C.H. Chapman, E.B. Collier, F.L. <br /> Purinton, J.W. Tubbs <br /> <br />Noes, Trustees None <br /> <br />Absent, Trustees Gao McPhee <br /> <br />Trustee Purinton introduced a resolution approving <br /> <br />assessment diagram for work done and improvement made <br /> <br />on N. Garnsey Street in accordance with Resolution of <br /> <br />Intention No. 1497. <br /> <br /> <br />