Laserfiche WebLink
971 <br /> <br />In Re <br /> <br />Distribution of <br /> <br />Advertising. <br /> <br /> In Re <br /> <br /> Bids <br /> <br />'Joint 0utfall Sewer <br />~xtension. <br /> <br />Ross Construction Co. <br />A. Giebisch <br />J.H.Tillman Co. <br />Butte Elec. Equipment Co. <br />Merritt-Ohapman & Scow <br /> <br />Mr. Norwood of the DeLuxe Printers was before the Board <br />w~th reference to tbs distributing of sdvert~ng matter <br />and wes advised of the or~nance prohibiting such distri- <br />bution. <br />. <br /> <br />This being the t~me and ~laee set f orthf or the opening of <br />bids or proposals for the extension of the Joint 0utfall <br />Sewer line, and the Board of Trustees being duly con,~ened <br /> <br /> open, examine and d~clsre <br /> <br />in open session, proceeded to <br />b~ds received, as follows: <br />P.ropos~t~on Noj 1. $ <br /> <br /> - for reclaiming, coa~ing <br />and relaying old plpe, furnishing and ]eying new pipe <br />without additional protective coating, and furnlsbing end <br />laying temporary steel pipe outfall line. <br /> <br /> For furnls~ing material and s~plying protective co~tlng <br /> <br />of manufacture to all new pipe, the sum <br />of $ , which sum shall be added to the lump sum bid <br /> <br />of Proposition No. 1. <br />Proposition No. 2. $ - for furnishing and lsyin~ <br /> <br /> all new pipe and maintaining present outfall line for <br /> <br />temporary out,all. <br /> <br /> For furnishing materi~ and applying protective coating <br />of manufacture to all new pipe, the sum of <br />~ , which sum w~a~l be added to the lump sum bid of <br /> <br />Proposition No. 2: <br /> <br /> Item 1. For reclaiming, cleaning! recoating and relaying <br />42" cast iron pipe on piling bents, $ per lin. ft. <br /> <br /> Item 2. For fnrnishing and laying 42" Class "B" <br />Standard Bell and Soi~ot Cast Iron Pipe on ~iling bents, the <br />sum of $ war lin. ft. <br /> <br /> Item ~. For furnishing and layin~ 42" Flexible ~oint <br />Cast Iron pipe, with piling or teemie concrete anchorage, <br />the sum of $ per lin. ft. <br /> <br /> Item4 . For furnishing material and applying the <br />protective enamel coating on A2" cast iron pipe and sDecials <br />the sum of $ per lin. ft. <br /> <br /> Item 8. For furnishing mater!al and ~nst~ling anchorage <br />piling, the sum of $ ~er pile. <br /> <br /> Item $. (Alternate) ~or furnishing material and nla~ing <br />tremie concrete, the s~ of $ per cu.yd. <br /> <br />Proposition No. 1 Coating <br /> <br />Proposition No.2 0oaring <br /> <br />221,2§0.00 8000. 221,280.00 8000. <br />2V2,01~.18 3042. 2V~.099.18 <br />221,$00.00 ~00. 219,800.00 <br />1V4,~50o00 8465. 1~,6~0.00 9825. <br /> 259,649.00 91~6. <br /> <br />Item 1 Item 2 Item $ Item <br /> <br />Item B Item B (Alters <br /> <br />80.80 ~80.80 88.~0 $8.~ 50.00 SO.O0 <br />iOV.O0 110.00 9V.08 1.BO 114.36 90.00 <br />55.00 50.00 100.00 1.S0 3V.50 25.00 <br />34.2V 56.A~ 6~.33 .36~ 86.50 23.00 <br />no bid 139.91 80.60 3.38~ no bid S5.00 <br /> <br />On ~otion of Trustee Goods, <br /> <br />seconded by Collier and carried <br /> <br />all bids were referred to the construction engineers and <br />various city engineers for checking, to report back at 4 P.I <br />Monday, August 2nd, 1.o26. <br /> <br /> <br />