Laserfiche WebLink
In Re <br /> <br />Widening <br /> <br />W. Seventeenth St. <br /> <br />In Re <br /> <br />Acquisition & <br /> <br />Improvement of <br /> <br />Santa Aha Boulevard. <br /> <br />101 <br /> <br />lights from Emma L. Mitchell and Joseph H. <br />accepted and the Clerk instructed to have <br /> <br />Mitchell, was <br />same recorded. <br /> <br />On motion of Trustee Goode, seconded by Chaney and car- <br /> <br />tied, the City -.Engineer was instructed to prepare plans <br /> <br />and specifications for the widening of West Seventeenth <br /> <br />Street between Main and Flower Street, according to peti- <br /> <br />tion filed. <br /> <br />On motion of Trustee Goode, seconded by McBride and car- <br /> <br />tied, the City Engineer was ordered to prepare and fur- <br /> <br />nish specifications for the Acquisition and Improvement <br /> <br />of District No. 4, known as Santa Ana Boulevard, of the <br /> <br />City of Santa Ana, California. <br /> <br /> ~ereas, the public interest and necessity require the <br />acquisitions and improvements hereinafter set forth: <br /> Now, Therefore, Be it Re~olved: That Clyde L. Jenken, <br />City Engineer of the City of Santa Ana is hereby appoin- <br />ted and designated and directed to prepare and furnish <br />specifications fe~ the proposed acquistion and improve- <br />ment of Santa Aha Boulevard frem Main Street to Chapman <br />Avenue, the proposed acquisition of North Broadway be- <br />tween its present Northerly termination and connecting <br />with said Santa Ana Boulevard, and the improvement of <br />Broadway from Santa Clara Avenue to and connecting with <br />the said Santa Ana Boulevard, and for the proposed acqui- <br />sition, widening and improvement of North Flower Street <br />from Santa Clara Avenue to and connecting with the pro- <br />posed Santa Ana Boulevard, including the construction of <br />birdges across the Santiago Creek on Santa Ana Boulevard <br />and Flower Street, and across the Santa Ana River on the <br />proposed Santa Ana Boulevard, and the acquistions for <br />necessary revetment work to protect the improvements pro- <br />posed to be constructed on said Santa Aha Boulevard, and <br />the improvement of portions of C~harlotte Street, Roe <br />Drive, Main Street, Chapman Avenue and Riverside Drive, <br />all as hereinafter described. Said specifications to <br />include descriptions of all property to be acquired, <br />together with a map or plat showing the same, and all <br />plans and profiles, cross-sections and specifications <br />necessary for the improvement, together with a statement <br />of the estimated costs of the same (inclusive of inciden- <br />tal expenses and costs of the proceeding) and also a <br />description of the district to be benefited by the propo- <br />sed acquisition and improvement, and to be known as the <br />"Assessment District", and a map or plat showing the sam( <br />and also the different zones within said district, con- <br />taining the lands to be benefited in like measure but in <br />· a different measure from those in other zones therein, <br />with a statement as to what percentage of the sum to be <br />raised each year for the payments on the principal and <br />interest of the bonds should be raised from each zone, <br />and shall show the grades to which the contemplated im- <br />provements are to be constructed; the said district to b( <br />known as "Acquisition and Improvement District No. 4 of <br />the City of Santa Ana." <br /> Said acquisition and improvements include the <br /> The acquisition of a strip of land seventy (70) feet <br /> in width, lying Northeasterly of an immediately adjacent <br /> to the Southern Pacific Railroad Companyts right of way, <br /> between Main Street and Chapman Avenue in the City of <br /> Santa Ana, County of Orange, State of California, such <br /> street to be known as and called Santa Ana Boulevard, <br /> together with the necessary parcels of land for revetmen~ <br /> work to protect the improvements t~$e made upon and <br /> along said Santa Ana Boulevard where the same crosses <br /> Santiago Creek, and for slope easements along said Boule. <br /> vard. <br /> That the improvement of the said proposed Santa Ana <br /> Boulevard shall include the grading and paving thereof <br /> with Portland Cement Concrete Pavement, and the construc. <br /> tion of Portland Cement'Concrete Curbs, along the curb <br /> lines of said street and at street intersections, around <br /> curves to intersect the curb lines of intersecting <br /> streets, excepting those portions of said proposed Santa <br /> Ana Boulevard to be occupied by two bridges, to be con- <br /> structed as hereinafter described; said Santa Aha Boule- <br /> vard also to be improvement by the installation of an <br /> ornamental lighting system consisting of cast iron single <br /> lighting standards, and all other necessary appurtenances <br /> thereto; the construction of a reinforced concrete bridge <br /> <br /> <br />