My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 (#900-1161)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1923 (#900-1161)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:47:40 PM
Creation date
4/15/2003 9:28:45 AM
Metadata
Fields
Template:
Pre-Charter
Year
1923
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction in said main sewer trench of an eight (8) <br /> inch inside diameter vitrified salt glazed cylindrical <br /> main sewer pipe properly connected with the manhole now <br /> constructed at the intersection of the center llne of North <br /> Bristol Street by the center line of ~tckey Street, and <br /> extending east properly connected with the manholes to <br /> be constructed to and properly connected with the flush <br /> tank to be Constructed on the center line of dickey Street <br /> at a point 1040 feet east of the point of intersection <br /> of the center line of dickey Street by the center line of <br /> North Bristol Street. <br /> <br /> The work and improvement which the Board of Trustees <br /> of the city of Santa Aha intends to order done and made <br /> in, on, and along ~orth Baker Street is briefly described <br /> as follows: <br /> <br /> (a) The excavation for and the construction of six <br />(6~) concrete manholes on approximately the center line of <br />North Baker Street, and two concrete syphon flush tank <br />a thereon, one of ssld manholes.to be constructed at each <br />of the following places: One Z95.34 feet, one 765.73 Feet, <br />and one 1120.~4 feet north of the point of intersection <br />of the center line of North Baker Street by the center <br />line of ~ickey Street, and one of soid flush tanks to be <br />constructed on the cente~ line of ~orth Baker Street at <br />a point 14V0.S4 feet north of the point of intersection <br />of the center line of ~tckey Street by the center llne of <br />North Baker Street; also one concrete manhole ~60oZ0 feet, <br />one V29.30 feet, and one 1090.Z0 feet north of the point <br />of intersection of the center line of North Baker Street <br />by the center line o~ ~est Washi:~gton Aven~e, and one of <br />said flush tanks to be constructed on the center line of <br />North Baker Street at a point 1440.~ feet north of the <br />point of intersection of the center llne of West Nashington <br />Avenue by the center llne of North B~ker Street. <br /> <br /> (b) The excavation along the center line of ~orth <br />Baker Street of a main sewer trench aprroxf~ately six (6) <br />feet deep and extending from the manhole to be constructed <br />at the point of intersection of ~orth Baker ~treet by the <br />center llne bf ~ickey Street north to the flush tank to <br />be constructed on the center line of ~orth Bsker Otreet <br />14V0.34 feet north of the center ~ine of hlekey Street; <br /> <br /> Also the exc~vatlon along the center llne of ~orth <br />Baker Street to a main sewer trench aprroxi~ately six feet <br />deep and extending from a manhole to be constructed at the <br />pointof intersection of t~e center llne Of ~orth Baker ~tree <br />by the center llne of West Washington Avenue north to the <br />flush tank to be constructed on the center line of North <br />Baker Street at a point 1440.~ feet nort~ of the center <br />line of West Washington Avenue. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.