My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 (#900-1161)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1923 (#900-1161)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:47:40 PM
Creation date
4/15/2003 9:28:45 AM
Metadata
Fields
Template:
Pre-Charter
Year
1923
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The construction in said main sewer trench of an <br /> <br />eight (8) inch inside diameter vitrified salt glazed <br />cylindrical main sewer pipe properly connected with the <br />manhole to be constructed at the point of intersection <br />of the center line of North Baker Street by the center <br />line of Hickey Street and extending north connected with <br />the manhole to be constructed to and connected with the <br />manhole to be constructed at a point on thece~ter line <br />of North Baker ~treet V85.V~ feet north of the point of <br />intersection of the center line of North Baker Street by <br />the center line of Hickey Street: also the construction <br />in said main sewer trench of a six (6) inch inside dia- <br />meter vitrified salt glazed c$1tndrical main sewer pipe <br />properly connected with the manhole to be constructed <br />the center line of North Baker Street at s point 765.73 <br />feet north of the point of intersection of the center line <br />of North Baker Street by the center line of aickey Street <br />~d'~'e~ten~'in~'~h%h~' n~rt~ pr perlyconne~tedwith the <br />manhole to and properly connected with the flush tank <br />to be constructed on the center line of ~orth Baker <br />Street at a point 14V0.34 feet nGrth of the point of <br />intersection of the center line of ~ickey Street by the <br />center line of ~orth Baker Street; <br /> <br /> The construction in said main sewer trench of an <br /> <br />eight (8i inch inside diameter vitrified salt glazed <br />cylindrical main sewer pipe properly connected with the <br />manhole to be const],ucted at the point of intersection <br />of the center line of North Baker Street by the center <br />line of West ~ashington ~venue and extending north prop- <br />erly connected with the manholes to and properly connect--- <br />ed with the flush tank to be constructed on the center <br />line of North Baker at a point 1440.3 feet north of the <br />center llne of West Washington Avenue. <br /> <br /> The work and improvement which t?e Bosrd of Trustees <br /> <br />of the city of Santa Aha intends to order done ~nd made <br />in, on, ~nd along ~'est Washington Avenue is briefly des- <br />cribed as follows: <br /> <br /> (a) The excavation for and the construction of <br /> <br />six (6) concrete manholes on orproximately the center <br />line of West l~,ashington Avenue and one concrete syphon <br />flush tank, one of said manholes to be constructed at <br />each of the following places: one 350 feet, one 69~.99 <br />feet, and one lOV5 feet, one 1461.V~ feet, one 1850 feet, <br />and one ~00 feet each of the point of intersection of <br />the center line of West ~ashington Avenue by the center <br />line of ~orth Bristol Street: the concrete syphon flush <br />tank to be constructed at a point on the center line of <br />West Washington Avenue by the center line of ~orth Brlstol~ <br />Street. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.