Laserfiche WebLink
3O2 <br /> <br />and the laying in each of said trenches of a lateral house <br />connection sewer, constructed in the form and manner provided <br /> <br />in the plans and speciflcattous for said work, hereinafter more <br />fully referred to, and extending from the main sewer pipe line-~ <br />now extatin~ in and approximately along the center line of sa~dl. )~ <br />North Garnsey Street, to and !us!de of the curb existing along <br />the East and West sides thereof, except where said sewers have <br />already been constructed. <br /> <br /> ~. The excavation of cue (1) lateral house connec- <br /> t!on sewer trench approximately five ($) feet in depth on the <br /> aforedescrtbed portion of the roadway of West Tenth Street, <br /> and the laylug in said trench of a lateral house connection <br /> sewer, constructed iu the form and manner provided in the <br /> plans and specifications for said work hereinafter more fully <br /> referred to, and extending from the main sewer pipe line now <br /> existing in and approximately along the center line of the <br /> above described street to and inside the curb line on the Nort~ <br /> <br />and South side thereof excepting where <br />ready been constructed. <br /> <br /> 8. The excavation of twelve <br /> <br />said sewers have al- <br /> <br />(12) lateral house <br /> <br />connection sewer trenches approximately si× (6) feet iu depth <br />ou the aforedescribed portion of the roadway of North Baker <br />Street, and the laying in each of said trenches of a lateral <br />house connection sewer, constructed in the form and manner <br />provided in the plans and specifications for said work, here- <br />inafter more fully referred to, and extending from the main <br />sewer pipe line now existing or to be constructed as iu this <br />Resolution provided, in and a~proxim~tely along the center <br />line of the above described street to and inside the curb line <br />on the East and West sides thereof except where said sewers <br />have already been constructed. <br /> <br /> 9. The excavation of a trench approximately six <br /> <br /> (6) feet in depth and the furnishing and the insta]liAg there- <br /> in of one (1) six (6) inch stub end sewer tn, on and along <br /> the roadway of the aforedescrtbed West Eighth Street on the <br /> center line of Towner ~treet extended from the main sewer <br /> pipe line as now existing in and approximately along the cen- <br /> ter line of West Eighth Street to the ~orth line of said West <br /> Eighth Street in accordance with plans and specifications <br /> hereinafter more fully referred to. <br /> <br /> 10. The excavatlou of trench a~proximately six (6) <br /> feet iu depth and ~he furnishing and installing therein of one <br /> (1) six (6) inch stub end sewer, in, on and along the roadway <br /> of the aforedescribed portion of West Eighth Street on the <br /> line of the center line of Louise Street extended South, and <br /> extending from the main sewer pipe line now existing in and <br /> approximately along the center line of West Eighth Street to <br /> the North line of said West Eighth Street, iu accordance with <br /> <br />-- <br /> <br /> <br />