(m) CAPS. Cal~ ahall be furnished with each branch of sewer pipe and sbsdl consist <br />of a disk, nu~de of the same materail ~s the pipe, three-fourths (~) of an inch thick, <br />~n~ sn'~ly the socket of the branch pipe. <br /> <br /> (n) TESTS. The tests for concrete pipes shall include the following: <br /> <br /> (1) ~and Bea~ Crushing Test. <br /> <br /> (2) Hydrostatic Pressure Test. <br /> <br /> (3) Abso~tion Test. <br /> <br /> The Superintendent of Streets shall select at random for tes6n~ purposes one length <br />of pipe for each two hundred (200) feet, or fraction thereof, of each size of pipe to be laid, <br />the minimmn number of specimens to be tested to be six (6) for each select]on of each size <br />of pipe. <br /> <br /> The pipe selected for testing purposes shall be deilvered by the Contractor when and <br />where directed. The cost of this pipe, of its transportation and of the tests as specified <br />herein~ shail be borne by the Contractor. <br /> <br /> The number of pipe to be tested for the Sand Bearing Crushing Test and the Hydro- <br />static Pressure Test shall be et least three ($~ for each of these tests and for each <br />eelectlo~ of each size of pipe` <br /> <br /> Whenever the length of each size of pipe to be laid is more than twelve hundred (1~0) <br />feet, that number of pipe which most closely represents fifty-one (51) per cent of the <br />specimens selected shall be tested for crushing strength and the remainder of the speci. <br />mens shall be tested for hydrostatic pressure. <br /> <br /> ~Fhe number of pipe to be tested for absorption shail be the same number is are <br />tested for crushing strength, and the pipe to be used for the absorption test shall be <br />selected from these pipes which have met the requirements in the first selection. <br /> In making any of the three (3) tests above mentioned, the number of pipes to be tested <br />in the second selection of pipe, as hereinafter specified, shall be five ($~ for each pipe <br />that fails to meet the requirements in the first selection. <br /> <br /> If in talking any one of thc three tests above mentioned eighty (80) per cent or more <br />of the specimens tested meet the reclulrements imposed by that test, all of the pipe in the <br />shipment or delivery corresponding to thc sizes so tested shall be considered as complying <br />with that test. <br /> If, however, more than twenty (20~ per cent of the specimens tested fail to meet the <br />requirements of that test, a second selection of pipe shall be m~de for that test. <br /> If eighty (80) per cent or more of the pipe selected including those first selected, <br />meet the requirements of that test, all of the pipe corresponding to the sizes so tested <br />shall be considered as complying with that test, otherwise all pipe of these sizes will be <br />rejected. <br /> Unless otherwise specified herei~, the specimens shall be sound pipe, having dimensions <br /> consistent with these specifications which pipe shall, before testing, be freed hum ail <br /> visible moisture. When so freed from moisture, each specimen shail be measured and <br /> inspected, and the resaits of the observations shall be recorded by the Superintendent of <br /> Streets. <br /> (1~ ,~ND BEARING CRUSHING TEST. The load shall be applied at a uniform <br />rate of about two thousand (2000~ pounds per minute or in increments of not more than <br />one hundred (100~ pounds at the same rate. <br /> The pipe shall not be allowed to stand under the load longer than is required to apply <br /> the loud and to observe and record it. <br /> <br /> <br />