Laserfiche WebLink
~eferenoe s he~b~.~de ~ <br /> <br /> RESOLVED, that the said Board of Trustees hereby re- <br />jects all of sai.d proposals or bids except that next herein <br />mentioned, and hereby awards the contract for ~fng said <br />and improvement to the lowest responsible bid~er, to-wit, <br />Robert:~on Electric Co., at the price n~med in their bid, as <br />fol]ows, to-wit: <br /> <br /> Item 1. The furnish~ng, fnstal~atio~ and construction <br />of double light ornamental lighting standards, fnc]udlng con- <br />crete foundations, anchor bolts, pot-hea~s, wiring, lamps, <br />globes, canopies an~ other necessary items ~s per plans and <br />specifications complete with the furnishing of all necessary <br />e$~.pment, lsbor and material on an estimate of twenty-one <br /> <br />(91) double light standards for the sum o~ Two hundred seventy- <br />n~ne and 80/100 dollars (~279.80) each. <br /> <br /> Item 2. The furnishing, installation an~ construction <br />of single light ornamental lighting standards, including con- <br />crete foundations, anchor bolts, pot-heads, wiring, lamps, globes, <br />canopies and other necessary items as per plans an5 speclflca- <br />t~ons, complete with the furnishing of all necessary eq_~ipment, <br />labo~ and materla] on an estimate o~ fifty-two (52) single light <br />standards for the sum of One hundred forty-five and no/lO0 <br />l~rs (~14~.00) each. <br /> <br /> <br />