Laserfiche WebLink
Item No. 3. The trehcing, furnishing and laying of <br />twenty (20) inch diameter reinforced concrete main sewer, complete <br />with the furnishing of all necessary equi~ent, labor and material <br />for the sum of Two and 6~/100 Dollars ($2.62) per linear foot. <br /> <br /> Item No. 4. The trenching, furnishing and laying of <br />twenty (20) inch diameter concrete main sewer complete with the <br />furnishing of all necessary equipment, labor and material for the <br />sum of Two and 31/100 Dollars ($2.31) per linear foot. <br /> <br /> Item No. 5. The trenching, furnishing and laying of <br />sixteen (16) inch diameter cast iron main sewer, complete with <br />the furnishing of all necessary equipment, labor and material for <br />the sum of Ten and no/lO0 Dollars ($10.00) per linear foot. <br /> <br /> Item No. 6. The trenching, furnishing and laying of <br />sixteen (16) inch diameter reinforced concrete main sewer, complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Two and 2~/100 Dollars ($2.22) per linear foot. <br /> <br /> Item No. 7. The trenching, furnishing and laying of <br />sixteen (16) inch diameter concrete main sewer, complete with the <br />furnishing of all necessary equipment, labor and material for the <br />sum of One and 69/100 Dollars ($1.690 per linear foot. <br /> <br /> Item No. 8. The excavation for and the const~uction of <br />one reinforced concrete structure according to detail No. 1 complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Fifty Dollars ($80.00) complete. <br /> <br /> Item No. 9. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 2 <br />complete with the furnishing of all necessary equipment, labor and <br />material for the sum of Fifty Dollars ($§0.00) complete. <br /> <br /> Item No. 10. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 3 complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Fifty Dollars ($50.00) complete. <br /> <br /> Item No. 11. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 4 complete <br />with the furnishing of all ne,cessary equipment, labor and material <br />for the sum of Fifty Dollars ($50.00) complete. <br /> <br /> Item No. 12. The excavation for and the constE~ctic~ of <br />one reinforced concrete structure according to detail No. 5 complete <br />with the furnishing of all necessary equipment labor and material <br />for the sum of Fifty Dollars ($50.00) complete. <br /> <br /> Item No. 15. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 6 complete <br />with the furnishing qf all necessary equipment, labor and material <br />for the sum.of Fifty Dollars ($50.00) complete. <br /> <br />Item No. 14. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. V complete <br /> <br /> <br />