Laserfiche WebLink
eight (8) inch diameter concrete main sewer, complete with th~ <br /> fu~nishing of all necessary equipment, labor and material for <br /> the mum of Eighty-five cents ($0.85) per linear foot. <br /> <br /> Item No. 2. The trenching, furnishing, and laying <br /> of six (6) inch diameter concrete main sewer complete with the <br /> furnishing cf all necessary equipment, labor and material for <br /> the sum of Seventy cents ($0.70) per linear foot. <br /> <br /> Item No. 3. The trenching, furnishing and laying <br /> of twenty (20) inch diameter reinforced concrete main sewer, <br /> complete with the furnishing of all necessary equipment, <br /> labor and material for the sum of Two Dollars and Ninety centa <br /> ($2.90) per linear foot. <br /> <br /> Item No. 4. The trenching, furnishing and laying <br />of twenty (20) inch diameter concrete main sewer complete <br />with the fur~ishing of all necessary equipment, labor and <br />material for the sum of Two Dollars and Fifty Cents ($2.50) <br />per linear foot. <br /> <br /> Item No. 5. The trenching, furnishing and laying <br /> of sixteen (16) inch diameter cast iron main sewer, complete <br /> with the furnishing of all necessary equipment, labor and <br /> material for the sum of Four Dollars and Fifty Cents ($4.50) <br /> per llnea~ foot. <br /> <br /> Item No. 6. The trenching, furnishing and laying <br /> of sixteen (16) inch diameter reinforced concrete main sewer, <br /> complete with the furnishing of all necessary equipment, labo~ <br /> and material for the sum of One Dollar and Seventy-five cents <br /> ($1.75) per linear foot. <br /> <br /> Item No. V. The trenching, furnishing and laying <br /> of sixteen (16) inch diameter concrete main sewer, complete <br /> with the furnishing of all necessary equipment, labor and <br /> material for the sum of One Dollar and Fifty Cents ($1.50) <br /> per linear foot. <br /> <br /> Item No. 8. The excavation for and the construct- <br /> ion of one reinforced concrete structure according to detail <br /> No. 1 complete with the furnishing of all necessary equipment, <br /> labor and material for the sum of Seventy-five Dollars ($75.0( <br /> complete. <br /> <br /> Item No. 9. The excavation for and the constructio~ <br /> of one reinforced concrete structure according to detail No. <br /> 2, complete with the furnishing of all necessary equipment, <br /> labor and material for the sum of Seventy-five Dollars ($75.0( <br /> complete. <br /> <br /> Item No. 10. The excavation for and the constructio~ <br /> of one reinforced concrete structure according to detail No. <br /> 3 complete with the furnishing of all necessary equipment, <br /> labor and material for the sum of Seventy-five Dollars <br /> <br /> <br />