My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1927 (#1716-1862)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1927 (#1716-1862)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:48:21 PM
Creation date
4/16/2003 3:26:55 PM
Metadata
Fields
Template:
Pre-Charter
Year
1927
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
($75.00) complete. <br /> <br /> Item No. 11. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 4 <br />complete with the furnishing of all necessary equipment, labor and <br />material for the sum of Seventy-five Dollars ($75.00) complete. <br /> <br /> Item No. 12. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 5 complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Seventy-five Dollars ($V5.00) complete. <br /> <br /> Item No. 13. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 6 complete <br />with the furnishing of all necessmr~y equipment, labor and material <br />for the sum of Seventy-five Dollars ($75.00) complete. <br /> <br /> Item No. 14. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 7 complete <br />$1th the furnishing of all necessary equipment, labor and material <br />for the sum of Seventy-five Dollars ($75.00) complete. <br /> <br /> Item No. 15. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 8, <br />complete with the furnishing of all necessary equipment, labor and <br />material for the sum of Seventy-five Dollars ($78.00) complete. <br /> <br /> Item No. 16. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 9 complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Seventy-five Dollars ($78.00) complete. <br /> <br /> Item No. lT. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 10 <br />complete with the furnishing of all necessary equipment, labor and <br />material for~the sum of Seventy-five Dollars ($76.00) complete. <br /> <br /> Item No. 18. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. ll <br />complete with the furnishing of all necessary equipment, labor and <br />material for the sum of Seventy-five Dollars ($76.00) complete. <br /> <br /> Item No. 19. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. l~ ~mplet <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Seventy-five Dollars ($75.00) complete. <br /> <br /> Item No. 20. The excavation for and the construction of <br />concrete sewer manholes complete with the furnishing of all <br />necessary equipment, labor and material for the sum of Fifty-five <br />Dollars ($55.00) eanh~ <br /> <br /> Item No. 21. The excavation for and the construction of <br />concrete sewer manholes, equipped with a Maddox Hand Sewer Flusher, <br />complete with the fur:~Ishing of all necessary equipment, labor and <br />material for the sum of One Hundred Dollars ($100.00) each. <br /> <br /> Item No. 22. The excavation for snd the construction of <br />concrete sewer flush tanks complete with the furnishing of all <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.