Laserfiche WebLink
of five (5) inches, complete with the f~rnishing of all necessary <br />equipment, labor and material for the sam of Seventeen and one-half <br />ce~ts ($0.175) per square foot. <br /> <br /> Item No. 3. The excavation for and the constraction <br />of Portland Cement Concrete Curbs, c~nplete with the furnishing of <br />all necessary equipment, labor and material for the sum of Fifty-fivE <br />cents ($0.§5) per linear foot. <br /> <br /> Item No. 4. The excavation for and the construction of <br />Portland Cement Concrete sidewalks having a total thickness of three <br />and one-half (3~) inches, complete with the furnishing of all neces- <br />sary equipment, labor and material for the sum of Sixteen and one- <br />half cents ($0.I65) per square foot. <br /> <br /> Item No. 5. <br />Portland Cement Concrete <br />(5) inches, complete with <br /> <br />The excavation for and the construction of <br />Sidewalks having a total thickness of five <br />the furnishing of all necessary equipment, <br /> <br />labor and material for the sum of Twenty-five cents ($0.25) per <br /> <br />sq~ are foot. <br /> <br /> Item No. 6. The trenching, furnishing and laying of <br />six (6) inch diameter vitrified clay pipe main sewer, complete with <br />the furnishing of all necessary equipment, labor and material for <br />th~ sum of Ninety cemts ($0.90) per linear foot. <br /> <br /> Item ~o. ?. The trenching, furnishing and laying of <br />four (4) inch diameter vitrified clay pipe house connectic~s sewers, <br />complete With the furnishing of all necessary equipment, labor and <br />material for ~he s~u~ c~ Seventy ce~ts ($O.VO) per linear foot. <br /> <br /> Item No. 8. The trenching, furnishing and laying of <br />six (6) inch diameter cast iron water main, together with all neces- <br />sary valves, concrete valve boxes, fittings and other necessary <br />appurtenances thereto, complete with the furnishing of all necessary <br />equipment, labor and material for the sum of One ar~ 20/100 ($1.20) <br />per linear foot. <br /> <br /> Item No. 9. The trenching, furnishing and laying of <br />three-quarter (~) inch diameter copper house connecting water ser- <br />vices, together with all nOrporation cocks, curb cocks, fittings and <br />necessary appurtenances thereto, complete with the furnishing of all <br />necessary equipment, labc~ and material for the sum of ~eventee <br />Dollars ($1V.O0) each. <br /> <br /> Item No. 10. The trenching, furnishing and laying of <br />three (3) inch dismeter wrought iron gas main complete with the fur- <br />nishing of all necessary equipm~t, labor and material for the sum <br />of Eighty-five cents ($0.85) per linear foot. <br /> <br /> Item No. 11. The trenching, furnishing and laying of <br />three-quarter (~) inch diameter Byers wrought iron gas house connect- <br />ing services, together with all cocks, fittings and necessary appur- <br />tenances thereto, complete with the furnishing of all necessary <br />equipment, labc~ and material for the sum of Fourteen and 40/100 <br />dollars ($14.00) each. <br /> <br /> <br />