My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-07-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Agenda Packet_2024-07-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:14:11 PM
Creation date
7/10/2024 4:43:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Date
7/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our team is also comprised of map/survey, geotechnical, environmental, traffic, and landscape/irrigation <br />review experts who are readily available to augment our team should the need arise. With staff located in <br />multiple local offices, we are able to pull from a large depth of resources to provide plan checking services. <br />We can ramp up quickly depending on the magnitude of the plan checks. Craig will utilize Harris' QA/QC <br />procedures to confirm accuracy of the team's deliverables. At the inception of each task, Craig will verify that <br />both the City and the project team fully understand the scope of services, schedule, budget, and expected <br />work product. Frank S. Lopez, PE, QSD will serve as Principal -in -Charge. As Harris' Engineering <br />Business Unit Vice President, Frank brings high-level commitment to this contract and will be responsible for <br />overseeing Harris' project delivery, quality management, and client experience. <br />t Key Personnel <br />(BGB) BGB Group, Inc. <br />(F) Fuscoe Engineering <br />(L) Leighton Group <br />(KDM) KDM Meridian <br />(KOA) KOA Corporation <br />Craig Siefert, PE ? (25%) <br />Associate-in-Charge/Project Manager <br />Michael Wu, PE, QSD ? (25%) <br />Plan Check Engineers <br />Cindy Hackett, PE ? (50%) <br />Brent Chamberlain, PE, QSD, LEED AP ? (50%) <br />Fong Tse, PE ? (25%) <br />Senior Civil Engineer, Plan Check <br />Phong Nguyen, PE (25%) <br />Teck Loh, PE, LEED AP (10%) <br />Assistant Engineer II <br />Alyssa Kumnoonsate, PE (10%) <br />Assistant Engineer I <br />Kayla Luong, EIT (10%) <br />Frank S. Lopez, PE, QSD <br />(10%) <br />Environmental Services <br />Yliana Ortega * (30%) <br />Landscape/Irrigation Reviewer <br />BGB Group (BGB) ? (50%) <br />WQMP Reviewer <br />Fuscoe Engineering (F) ? (50%) <br />Geotechnical Reviewer <br />Leighton Group (L) ? (50%) <br />Map Checker <br />KDM Meridian (KDM) ? (50%) <br />Traffic Reviewer <br />KOA Corporation (KOA) ? (50%) <br />Each team member's percentage of time devoted to this contract is indicated next to their name. <br />Harris&AssociaCt itxcC'ouncil 15 — 159 1.c. Firm/1 d120m2xperience <br />
The URL can be used to link to this page
Your browser does not support the video tag.