My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-07-16 (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Agenda Packet_2024-07-16 (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 10:47:05 AM
Creation date
7/12/2024 10:31:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .E. RELEVANT PROJECT EXPERIENCE <br /> As-Needed Plan Checking Services <br /> City of Anaheim <br /> Project Description: Services under this contract include plan review <br /> for entitlement purposes, design plan check, standards implementation, <br /> hydrology and hydraulics check, sewer capacity studies, street <br /> improvement plan check, dry utility (fiber and small cell installation) <br /> review, and grading plan check. The Harris team evaluates the <br /> feasibility of proposed site development in order to assist the City's land <br /> acquisition evaluation and due-diligence review. Our current scope of <br /> work includes the following services: <br /> • Evaluate telecommunications applications and identify conflicts with <br /> dry utilities. <br /> • Review of hydrology reports and maps for drainage related challenges. <br /> This also consists of reference sheet review for other related drainage <br /> or engineering concerns that affect the site or adjacent properties. <br /> • Review of soils investigation studies and reports for any geologic REFERENCE <br /> conditions that could restrict the intended use of the site. We also Mike Eskander <br /> request sufficient information to identify existing and potential geologic Development Services <br /> hazards, and determine potential impacts. Our final summary Manager <br /> recommends mitigation measures, suitability of site for intended o:714.765.4414 <br /> storm water measures and identifies significant unmitigated geologic E�i:meskander@anaheim.net <br /> impacts. <br /> • Review of hydrology studies for calculations of pre- and post- RELEVANT ELEMENTS <br /> development run-off and sizing calculations for on-site detention Plan Check <br /> basin for water quality purposes. It is also reviewed for the purpose Project Management <br /> of determining if there is a cause to construct new and/or additional LOCATION <br /> storm drain improvements. Anaheim, California <br /> • Each review includes the preparation of an electronic document <br /> summary report of challenges and comments which is then provided YEARS <br /> to the City after coordinating with all internal departments. 2016 - Ongoing <br /> LAMP Plan-Check Engineering and Permit Issuance Support <br /> Services REFERENCE <br /> City of Los Angeles, Bureau of Engineering Shawyue "Shay" Doong, PE <br /> Principal Civil Engineer <br /> To relieve traffic and congestion at the world's fifth busiest airport, ©:213.887.2827 <br /> LAWA is in the process of embarking on an extensive LAMP that will i-�i:shawyue.doong@lacity.org <br /> not only provide a more predictable and reliable commute to the airport, <br /> but also offer a world-class traveler experience at LAX. Major project RELEVANT ELEMENTS <br /> elements include an elevated 2.25-mile Automated People Mover, two Plan Check <br /> Intermodal Transportation Facilities, a Consolidated Rent-a-Car facility, Project Management <br /> and a comprehensive series of roadway improvements to alleviate traffic <br /> congestion in and around airport facilities. LOCATION <br /> Los Angeles, California <br /> Working closely with the Bureau of Engineering's LAMP team, Harris <br /> has reviewed dozens of large roadway realignments, storm drain YEARS <br /> improvements, sewer rehabilitations, and other LAWA infrastructure for 2019 - Ongoing <br /> compliance with LA BOE standards, design guidelines, and manuals. <br /> Harris&AssociaCstxcCouncil 15 — 162 l.e.Rel7/1 P�o2je0ctExperience 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.