Laserfiche WebLink
2. SCOPE OF SERVICES AND SCHEDULE <br /> Storm Drain Plan Check. Plans for storm drain <br /> Harris has assisted . _ improvements are checked to verify consistency of <br /> all aspects of - plan and map review and drainage facility information with the hydrology and <br /> development proc- hydraulic data in the drainage report. The plan check <br /> capacity analysis, impro - will verify materials, slopes, lengths, water surface <br /> development management systems,staff elevations, flow rates, debris retention volumes and <br /> training,tentative and basin sizing, alignments, and construction details to <br /> constructionproject ' permit verify compliance to City standards. <br /> processing. Grading and Erosion Control Plan Check. Our <br /> Harris' strength in plan check is based on a review of the plan includes surface improvements, <br /> foundation of cumulative knowledge and extensive drainage improvements and Low Impact <br /> experience of implementing applicable Agency Development (LID) elements to be constructed, <br /> standards, ordinances, and state and local laws that water quality Best Management Practices (BMPs), <br /> are relevant to the delivery of plan check services. and erosion control devices or BMPs to be installed. <br /> Harris provides these services primarily to public Surface improvements include, but are not limited <br /> agencies and therefore has no conflict of interest. to, paving, curb and gutters, concrete sidewalks, <br /> Harris' customer-oriented mindset contributes to and other surface improvements specific to the <br /> a quick plan review process and approval, as we development's use. Geotechnical recommendations, <br /> see ourselves as an extension to City staff. such as pavement structural section and compaction <br /> density requirements, will be reviewed. Grading <br /> Typical Services Provided for Public Works plans are also checked for conformance to the City's <br /> Design Plan Check Services Grading Ordinance, and that of the Specific Plan and <br /> Roadway, Driveway, Sidewalk, Curb and Gutter, other entitlement requirements from the conditions <br /> and Pedestrian Ramp Improvements Plan Check. of approval. <br /> Improvements are checked to verify compliance with Environmental Services <br /> City standards, any applicable specific/master plans, Our services will include categorical exemptions, <br /> applicable Caltrans standards and specifications, negative declarations, mitigated negative <br /> Standard Plans for Public Works Construction, and declarations, and environmental impact reports in <br /> State American Disabilities Act (ADA) accessibility compliance with the California Environmental Quality <br /> guidelines. Plans will be reviewed in City-approved Act (CEQA). In addition, we are available to provide <br /> format with all the applicable notes and details, and technical studies related to air quality, greenhouse <br /> constructability with sufficient horizontal and vertical gas emissions, noise, biological resources, and <br /> controls for staking purposes. Plan check reviews cultural resources. <br /> will be conducted utilizing the City's checklist and <br /> will be conformant to processes. Plan check redline WQMP Review. Our team will confirm compliance <br /> comments are noted on plans and supplemented with with regulatory requirements and City preferences to <br /> a summary email of comments to be addressed and/ make sure on-site water quality features are designed <br /> or corrected with next plan check submittal. and located appropriately. <br /> Hydrology and Hydraulics Check. Hydrology Geotechnical Report Review. Geotechnical reviews <br /> reports shall address pre- and post-development will be conducted to verify projects have been <br /> conditions. They shall include evaluation of prepared in substantial compliance with the standard <br /> watershed and subarea boundaries based on of care expected. Our team is able to review pertinent <br /> topography and drainage features, land use, soils, existing geotechnical maps and reports that pertain <br /> drainage patterns, pre- and post-construction runoff to the project site. In our review, we will consider <br /> peak flows, volumes, and timing. Hydraulics reports the adequacy of the background research, field <br /> and calculation reviews will include review of the data collection process including geologic mapping, <br /> existing and proposed drainage systems, evaluation number and depths of exploratory borings, and <br /> of model accuracy, compliance with City and County laboratory testing program. We will evaluate the data <br /> standards, and general modeling practices, interpretation, approach, and method in developing <br /> Harris&Associat(e'sttf cC'OUr1Cll 15 — 165 z.scope o}/1 6i/e2s a0;Schedule 9 <br />