Laserfiche WebLink
recommendations for the slope improvements. Signing and Striping Plan Check. Review of <br /> The review will be conducted to verify substantial final and interim placement of signs and striping <br /> compliance with the requirements of the California are conducted to verify conformance with the <br /> Building Code (CBC), Green Book, California California Manual on Uniform Traffic Control <br /> Geological Survey (CGS) Note 41, Guidelines for Devices (CAMUTCD), Caltrans Standard Plans, <br /> Reviewing Geologic Reports, and CGS Special City standards, Traffic and Transportation Design <br /> Publication 117. Guidelines, and plan check checklists. Items revised <br /> Subdivision Map Checking. Land surveying maps during plan check will be verified against applicable <br /> and documents prepared for public agency review traffic studies, standards and other active projects. <br /> have wide implications on both land ownership and Street Light Plan Review. Our team will verify the <br /> public safety. These documents create, describe, submitted plans are prepared in accordance with the <br /> modify, and encumber both public and private lands, City's traffic and transportation design guidelines, <br /> leaving a permanent impact on public resources and City standards, and current Design Guide Checklists. <br /> private investment. The City's oversight role is critical We will work to identify proper locations and types of <br /> because these documents need to be prepared in electrical service pedestals, particularly where street <br /> accordance with State laws and City ordinances lights can be fed from traffic signal services. <br /> in addition to verifying their technical correctness. Miscellaneous Reviews. Our team is capable <br /> Maps and documents are checked for compliance <br /> with the State Subdivision Map Act, Land Surveyor's of reviewing potable water, recycled water, <br /> Act, applicable City codes and ordinances, approved sewer system, small cell tower, demolition, <br /> tentative map, and the conditions of approval. telecommunication/dry utility facilities, CIP-related <br /> improvements, and several other plan set designs on <br /> Landscape and Irrigation Improvement Plan behalf of the City upon request. <br /> Check. Our team will provide landscape and <br /> irrigation review for parkways, medians, and all Schedule <br /> areas within the right-of-way. There are standards We understand that timely comments are a critical <br /> that must be followed whether the development is project success factor. Solutions are best found when <br /> employing potable or recycled water. Using reference challenges are fresh in the designer and owners' <br /> documents such as zoning maps, our team will minds as well as the agency. We also understand that <br /> review submittals for completeness and compliance the City's position in conflict resolution can be highly <br /> with appropriate landscape and irrigation standards compromised by delays. <br /> including codes/requirements for water-efficient <br /> landscaping. Understanding policies to promote Harris is committed to delivering <br /> conservation and efficient use, while still providing within the set time lines - <br /> areas for recreation and environmental enhancement, within 3-4 weeks and subsequent checks within 2 <br /> is a service the Harris team is capable of providing. <br /> Traffic Signal Review. Our team will verify <br /> conformance to all applicable standards and Our flexible and responsive team of resources has <br /> requirements. Gaining a full understanding of the the capability to provide an expedited review in five <br /> City's project goals and outlook will allow our team to working days or less in response to the City's needs <br /> see pertinent details and address any deviations. In or increased demands. Harris demonstrates to <br /> addition to review of signal interconnects, pull/junction our clients our ability to meet their goals by <br /> boxes, signage, power, and detectors, our thorough prioritizing competing deadlines for various City <br /> knowledge of current State standards (Caltrans), projects, while completing thorough plan checks <br /> Highway Design Manual, Highway Capacity Manual, in the required timeframe. The solution can be as <br /> and the California Manual on Uniform Traffic Control simple as adding resources at the City's request, <br /> Devices (CA MUTCD) will allow Harris to advise the which requires effective orchestration of Harris staff's <br /> City of any and all deviations from standards. time, as well as communication with the City staff <br /> to make sure the team thoroughly understands the <br /> City's expectations and any plans that might take <br /> priority. This approach has been effective in meeting <br /> our clients' goals and deadlines providing similar <br /> services. <br /> Harris&AssociacitxcC'ouncil 15 — 166 z.scopeof /16/20??s4chedule 0 10 <br />