Laserfiche WebLink
Craig Siefert, PE <br /> PROJECT MANAGER/PRINCIPAL AGENT <br /> Craig has 20 years of experience on a variety of public works projects including t <br /> sewer, water, storm drain, grading, and roadway improvements. Craig has <br /> supported the cities of Ontario, Anaheim, Menifee, Tustin, Irvine, Victorville, <br /> and Huntington Beach (to name a few) with their development review programs. <br /> Craig has prepared, analyzed, and updated City Standards, development review <br /> processes, and plan check lists for many of his clients in Southern California. <br /> Craig has design experience with all aspects of roadway improvement and <br /> rehabilitation work, including pavement resurfacing, ADA compliance, sidewalks, EDUCATION <br /> curbs and gutters, and driveways replacement. He is familiar with construction BS, Civil Engineering <br /> manuals and methodologies used in streets, storm drain pipes and structures, <br /> wastewater structures, and reinforced concrete structures, and CADD software. REGISTRATION <br /> His experience working in the capacity of agency staff provides him <br /> intimate familiarity with the inner works of city government, through which Professional Civil <br /> he developed excellent orientation towards providing his clients out- Engineer, CA <br /> standing customer service in serving their development constituency. <br /> RELEVANT EXPERIENCE <br /> • City of Anaheim, On-Call Plan Checking Staff Augmentation Services. <br /> Project Manager. Harris has been providing plan check services for the City <br /> since 2016, which include plan review for entitlement purposes, design plan <br /> check, standards implementation, hydrology and hydraulics check, sewer <br /> capacity studies, street improvement plan check, dry utility (fiber and small cell <br /> installation) review, and grading plan check. Craig and the Harris team evaluate <br /> the feasibility of proposed site development in order to assist the City's land <br /> acquisition evaluation and due-diligence review. <br /> • City of Ontario, On-Call Plan Checking, Map Checking, and City <br /> Surveyor's Services. Project Manager. Harris has been providing plan/ <br /> map check and surveyor's services for the City since 2010 which includes <br /> review of improvement plans (street, traffic signals, and street striping/signing, <br /> water, recycled water, sewer, and storm drain), reports (hydrology and water <br /> quality management plans), subdivision maps, easement documents, corner <br /> records, tie monument sheets, and other land related legal instruments. Craig <br /> is directly involved with project organization, budget tracking, plan review, <br /> and management of sub-consultants related to map checking tasks. Working <br /> closely with City staff, he verifies turnaround timelines are met and meetings <br /> are scheduled with applicants when redline comments are left unaddressed or <br /> design coordination is necessary. <br /> • City of Los Angeles, Bureau of Engineering, Landside Access <br /> Modernization Program. Project Manager. To relieve traffic and congestion at <br /> the world's fifth busiest airport, Los Angeles World Airports (LAWA) (Applicant) <br /> is embarking on an extensive Landside Access Modernization Program <br /> (LAMP) that will not only provide a more predictable and reliable commute <br /> to the airport, but also offer a world class traveler experience at Los Angeles <br /> International Airport (LAX). The major elements of LAMP include an elevated, <br /> 2.25-mile Automated People Mover (APM), two Intermodal Transportation <br /> Facilities (ITF), a Consolidated Rental Car facility (ConRAC), and a <br /> comprehensive series of roadway improvements to alleviate traffic congestion <br /> in and around airport facilities. This system will also connect LAX with Metro's <br /> proposed Airport Metro Connector (AMC) 96th Street Transit Station. <br /> City Council 15 — 168 7/16/2024 <br /> Harris&Associates, c. <br />