• City of Rancho Santa Margarita, On-Call Plan
<br /> Craig Siefert, PE Check Services. QA/QC Manager. Services
<br /> include review of grading plans, street improvement
<br /> Harris is working with LAWA to facilitate expedited plans, erosion and sediment control plans,
<br /> plan review within the context of design-build landscaping/irrigation control plans, hydrology and
<br /> project delivery method in accordance with the hydraulics calculations, and cost estimates.
<br /> City's standards and permit requirements. City of Fullerton, Beckman Business Center
<br /> • Eastern Municipal Water District, On-Call Plan Entitlement Review. Project Manager. Craig
<br /> Checking and Development Review Services. verified calculations for flows regarding the existing
<br /> Project Manager. Harris has been providing drainage channel versus replacing the channel
<br /> development review services to the District since with an underground storm drain line, coordinated
<br /> 2012. Craig and his team have completed more comments with the Orange County Flood Control
<br /> than 100 projects for the District. Services include District regarding undersized facilities, reviewed
<br /> review and critique of potable water, recycled pre- and post-development hydrology reports and
<br /> water, and sanitary sewer improvements plans for maps for drainage related issues, and verified
<br /> conformance with the District's design guidelines, adequacy of flood depth design for safety of an
<br /> specifications, and administrative code. Craig and historic building.
<br /> the Harris revised the District's as-built drawings City of Gonzales, Citywide Sewer Condition
<br /> for added water services, per service orders. The
<br /> Harris team also met with District staff to discuss Assessment. Project Manager. Harris provided
<br /> new project submittals and plan of service and project management and professional engineering
<br /> services for a citywide sewer cleaning and CCTV
<br /> coordinated with the developer's engineer regarding
<br /> revisions and improvement issues to help facilitate inspection/assessment which included condition
<br /> an efficient plan review. assessment of 270 gravity sewer manholes
<br /> and five sewer lift stations, and inspection of
<br /> • City of Menifee, Staff Augmentation & Land approximately 10,000 LF of force main sewer pipes.
<br /> Development Plan Checking. Project Manager. Craig and the Harris team coordinated with City
<br /> Harris has been providing staff augmentation staff, reviewed subconsultant prepared condition
<br /> and plan check services for land development assessment reports, DVDs, and recommendations,
<br /> for the City since 2016. This includes the review and prepared the engineer's preliminary opinion
<br /> of permits and applications, small grading plan of probable construction costs for related repairs,
<br /> checks, front counter duties, and dealing directly a prioritization list, and a color-coded Citywide
<br /> with the public. Additional services provided include conditions exhibit illustrating the condition of the
<br /> review of residential and commercial grading plans, City's sewer system.
<br /> street improvement plans, erosion and sediment City of Fullerton, West Coyote Hills
<br /> control plans, landscaping/ irrigation control plans, Infrastructure Cost Estimate Analysis. Project
<br /> hydrology and hydraulics calculations, water Engineer. Craig confirmed the reasonableness
<br /> quality management plan review, and cost estimate
<br /> verification. Craig oversees the Harris team placed of the unit prices in the original estimate using
<br /> in the City's offices to confirm proper staffing a various recent bid prices, his experience, and input
<br /> quality of work. In addition, Craig has provided from construction contractors/material suppliers
<br /> input and updates to the City's staff structure, fee and supporting subconsultants as needed. A
<br /> collection, and plan tracking processes. reasonableness check/order of magnitude check
<br /> was performed on the quantities. Finally, a
<br /> • Riverside County Flood Control and Water review of the pertinent sections of the Conditions
<br /> Conservation District, On-Call Plan Review. of Improvements was performed for additional
<br /> Project Manager. Since 2020, Harris has been background information, an understanding of the
<br /> working with the District to review storm drain improvements, and a general confirmation of the
<br /> improvement plans, hydrology, soil structures proposed project requirements.
<br /> and CEQA/NEPA requirements for development
<br /> projects throughout the County. Craig coordinates
<br /> all plan review projects with the District and
<br /> manages work quality for the Harris team and
<br /> subconsultants.
<br /> City Council 15 — 169 7/16/2024
<br /> Harris&Associates, c.
<br />
|