Laserfiche WebLink
• City of Rancho Santa Margarita, On-Call Plan <br /> Craig Siefert, PE Check Services. QA/QC Manager. Services <br /> include review of grading plans, street improvement <br /> Harris is working with LAWA to facilitate expedited plans, erosion and sediment control plans, <br /> plan review within the context of design-build landscaping/irrigation control plans, hydrology and <br /> project delivery method in accordance with the hydraulics calculations, and cost estimates. <br /> City's standards and permit requirements. City of Fullerton, Beckman Business Center <br /> • Eastern Municipal Water District, On-Call Plan Entitlement Review. Project Manager. Craig <br /> Checking and Development Review Services. verified calculations for flows regarding the existing <br /> Project Manager. Harris has been providing drainage channel versus replacing the channel <br /> development review services to the District since with an underground storm drain line, coordinated <br /> 2012. Craig and his team have completed more comments with the Orange County Flood Control <br /> than 100 projects for the District. Services include District regarding undersized facilities, reviewed <br /> review and critique of potable water, recycled pre- and post-development hydrology reports and <br /> water, and sanitary sewer improvements plans for maps for drainage related issues, and verified <br /> conformance with the District's design guidelines, adequacy of flood depth design for safety of an <br /> specifications, and administrative code. Craig and historic building. <br /> the Harris revised the District's as-built drawings City of Gonzales, Citywide Sewer Condition <br /> for added water services, per service orders. The <br /> Harris team also met with District staff to discuss Assessment. Project Manager. Harris provided <br /> new project submittals and plan of service and project management and professional engineering <br /> services for a citywide sewer cleaning and CCTV <br /> coordinated with the developer's engineer regarding <br /> revisions and improvement issues to help facilitate inspection/assessment which included condition <br /> an efficient plan review. assessment of 270 gravity sewer manholes <br /> and five sewer lift stations, and inspection of <br /> • City of Menifee, Staff Augmentation & Land approximately 10,000 LF of force main sewer pipes. <br /> Development Plan Checking. Project Manager. Craig and the Harris team coordinated with City <br /> Harris has been providing staff augmentation staff, reviewed subconsultant prepared condition <br /> and plan check services for land development assessment reports, DVDs, and recommendations, <br /> for the City since 2016. This includes the review and prepared the engineer's preliminary opinion <br /> of permits and applications, small grading plan of probable construction costs for related repairs, <br /> checks, front counter duties, and dealing directly a prioritization list, and a color-coded Citywide <br /> with the public. Additional services provided include conditions exhibit illustrating the condition of the <br /> review of residential and commercial grading plans, City's sewer system. <br /> street improvement plans, erosion and sediment City of Fullerton, West Coyote Hills <br /> control plans, landscaping/ irrigation control plans, Infrastructure Cost Estimate Analysis. Project <br /> hydrology and hydraulics calculations, water Engineer. Craig confirmed the reasonableness <br /> quality management plan review, and cost estimate <br /> verification. Craig oversees the Harris team placed of the unit prices in the original estimate using <br /> in the City's offices to confirm proper staffing a various recent bid prices, his experience, and input <br /> quality of work. In addition, Craig has provided from construction contractors/material suppliers <br /> input and updates to the City's staff structure, fee and supporting subconsultants as needed. A <br /> collection, and plan tracking processes. reasonableness check/order of magnitude check <br /> was performed on the quantities. Finally, a <br /> • Riverside County Flood Control and Water review of the pertinent sections of the Conditions <br /> Conservation District, On-Call Plan Review. of Improvements was performed for additional <br /> Project Manager. Since 2020, Harris has been background information, an understanding of the <br /> working with the District to review storm drain improvements, and a general confirmation of the <br /> improvement plans, hydrology, soil structures proposed project requirements. <br /> and CEQA/NEPA requirements for development <br /> projects throughout the County. Craig coordinates <br /> all plan review projects with the District and <br /> manages work quality for the Harris team and <br /> subconsultants. <br /> City Council 15 — 169 7/16/2024 <br /> Harris&Associates, c. <br />