|
/1 Lei ghton FEE SCHEDULE
<br /> .verdant..company
<br /> METHOD $/TEST METHOD $/TEST
<br /> REINFORCING STEEL AND PRESTRESSING STRANDS STREET LIGHTS/SIGNALS
<br /> Rebar tensile test,<_up to No.11 (ASTM A370)................................................70 LED Luminaires/Signal Modules/Countdown Pedestrian Signal Face
<br /> Rebar tensile test,>_No.14&over(ASTM A370)...........................................215 Modules(caitrans RSS 86)........................................................................1,390
<br /> Rebar bend test,up to No.11(ASTM A370)......................................................70 SPRAYAPPLIED FIREPROOFING
<br /> Rebar bend test,>—No. 14&over(ASTM A370)..............................................215 Unit weight(density,ASTM E605)........................................................................65
<br /> Resistance butt-welded hoops/bars,tensile test,<_up to No.10(CTM 670)....70
<br /> Resistance butt-welded hoops/bars,tensile test,>_No.11&over(CTM 670)...90 FASTENERS/BOLTS/RODS
<br /> Mechanical rebar splice,tensile test,<—up to No.11(CTM 670).......................70 F3125 GRA307,A325 Bolts,tensile test,<—up to 1-1/4"diameter,plain
<br /> Mechanical rebar splice,slip test,<—up to No. 11(CTM 670)............................45 (ASTM A370).................................................................................................70
<br /> Mechanical rebar splice,tensile test,>—No. 14&over(CTM 670)..................215 F3125 GRA307,A325 Bolts,tensile test,<—up to 1-1/4"diameter,
<br /> Mechanical rebar splice,slip test,>_No. 14&over(CTM 670).......................215 galvanized(ASTM A370)...............................................................................80
<br /> Headed rebar splice,tensile test,<_up to No. 11 (CTM 670)............................70 A490 Bolts,tensile test,<_up to 1-1/4"diameter,plain(ASTM A370)................70
<br /> Headed rebar splice,tensile test,>_No.14&over(CTM 670).......................215 A490 Bolts,tensile test,<_up to 1-1/4"diameter,galvanized(ASTM A370)......80
<br /> Epoxy coated rebar/dowel film thickness(coating)test(ASTM A775/A934).......50 A593 Bolts,tensile test,<_up to 1-1/4"diameter,stainless steel(ASTMA37o)...70
<br /> Epoxy coated rebar/dowel continuity(Holiday)test(ASTM A775/A934).............70 F1554 Bolts,tensile test,<_up to 1-1/4"diameter,plain(ASTM A370)............110
<br /> Epoxy coated rebar flexibility/bend test,up to No.11(ASTM A775/A934)..........50 F1554 Bolts,tensile test,<_up to 1-1/4"diameter,galvanized(ASTMA370)...130
<br /> Prestressing wire,tension(ASTMA416).........................................................190 SAMPLE TRANSPORT
<br /> Sample preparation(cutting) .........................................................................55 Pick-up&delivery(weekdays,per trip,<50 mile radius from Leighton office) A10
<br /> EQUIPMENT LIST
<br /> ITEM $UNIT ITEM $ UNIT
<br /> 1/4 inch Grab plates................................................................................5 each Moisture test kit(excludes labor to perform test,ASTM E1907)...........65 test
<br /> 1/4 inch Tubing(bonded)....................................................................0.60 foot Nuclear moisture and density gauge ....................................................88 day
<br /> 1/4 inch Tubing(single)......................................................................0.40 foot Electrical moisture and density gauge ..................................................88 Day
<br /> 3/8 inch Tubing,clear vinyl ................................................................0.60 foot Pachometer...........................................................................................50 day
<br /> 4-Gas meter(RKI Eagle or similar)/GEM 2000...................................140 day Particulate Monitor...............................................................................135 day
<br /> Air flow meter and purge pump(200 cc/min).........................................55 day pH/Conductivity/Temperature meter......................................................60 day
<br /> Box of 24 soil drive-sample rings.........................................................130 box Photo-Ionization Detector(PID)...........................................................130 day
<br /> Brass sample tubes...............................................................................11 each Pump,Typhoon 2 or 4 stage.................................................................55 day
<br /> Caution tape(1000-foot roll)..................................................................22 each QED bladder pump w/QED control box...............................................175 day
<br /> Combination lock or padlock.................................................................15 each Quire fee—Phase I only......................................................................250 each
<br /> Compressed air tank and regulator.......................................................55 day Resistivity field meter and pins............................................................200 day
<br /> Concrete coring machine(<-6-inch-dia)...............................................160 day Slip/threaded cap,2-inch or 4-inch diameter,PVC Schedule 40.........20 each
<br /> Consumables(gloves,rope,soap,tape,etc.).......................................40 day Slope inclinometer...............................................................................250 day
<br /> Core sample boxes................................................................................30 each Soil sampling T-handle(Encore)...........................................................10 day
<br /> Crack monitor Two-Dimensional............................................................30 each Soil sampling tripod...............................................................................40 day
<br /> Crack monitor Thee-Dimensional..........................................................40 each Speedy(R)moisture tester....................................................................10 day
<br /> Cutoff saws,reciprocating,electric(Sawzall®).....................................80 day Stainless steel bailer..............................................................................60 day
<br /> D-Meter Walking Floor Profiler............................................................110 day Submersible pump with controller.......................................................180 day
<br /> Disposable bailers.................................................................................25 each Submersible pump/transfer pump,10-25 gpm......................................65 day
<br /> Disposable bladders..............................................................................20 each Support service truck usage(well installation,etc.).............................250 day
<br /> Dissolved oxygen meter........................................................................50 day Survey/fence stakes..............................................................................10 each
<br /> DOT 55-gallon containment drum with lid.............................................85 drum Tedlar®bags.........................................................................................25 each
<br /> Double-ring infiltrometer......................................................................135 day Traffic cones(<-25)/barricades(single lane)..........................................55 day
<br /> Dual-stage interface probe....................................................................85 day Turbidity meter......................................................................................80 day
<br /> Dynamic Cone Penetrometer..............................................................430 day Tyvek®suit(each).................................................................................25 each
<br /> Generator,portable gasoline fueled,3,500 watts..................................90 day Vapor sampling box...............................................................................65 day
<br /> Global Positioning System/Laser Range Finder....................................80 day Vehicle usage(carrying equipment)......................................................20 hour
<br /> Handauger set......................................................................................90 day VelociCalc..............................................................................................40 day
<br /> HDPE safety fence(<-100 feet).............................................................40 roll Visqueen(20 x 100 feet).....................................................................130 roll
<br /> Horiba U-51 water quality meter..........................................................135 day Water level indicator(electronic well sounder)<300 feet deep well....100 day
<br /> Light tower(towable vertical mast)......................................................150 day ZIPLEVEL®...........................................................................................40 day
<br /> Magnehelic gauge.................................................................................15 day Other specialized geotechnical and environmental testing and monitoring
<br /> Manometer............................................................................................25 day equipment are available,and priced per site
<br /> Mileage(will adjust with IRS published rate).......................................0.67 mile
<br /> Fee/2024 www.leightongroup.com Page 3 of 4
<br /> City Council 15 — 199 7/16/2024
<br /> Harris&Associates, nc.
<br />
|