Laserfiche WebLink
%/i Leighton FEE SCHEDULE <br /> a verdant..company <br /> TERMS AND CONDITIONS <br /> Expiration: This fee schedule is effective through insurance,travel,subsistence, project-specific <br /> December 31,2024 after which non-prevailing wage parking charges,shipping, reproduction, and other <br /> rates for remaining or additional services will increase reimbursable expenses will be invoiced at cost plus <br /> by 4%on January 1 st of each year. 20%, unless billed directly to and paid by client. <br /> Proposal Expiration: Proposals are valid for at Invoicing: Invoices are rendered monthly, payable <br /> least 30 days,subject to change after 30 days; unless upon receipt in United States dollars. Aservice <br /> otherwise stated in an attached proposal. charge of 1'/-percent per month will be charged for <br /> Prevailing Wages: Our fees for prevailing wage work late payment. <br /> are based upon California prevailing wage laws and Client Disclosures: Client agrees to provide all <br /> wage determinations. Unless specifically indicated in information in Client's possession about actual or <br /> our proposal, costs for apprentice are not included. If possible presence of buried utilities and hazardous <br /> we are required to have an apprentice on your project, materials on the project site, prior to fieldwork, and <br /> additional fees will be charged. Prevailing wage rates agrees to reimburse Leighton for all costs related to <br /> will increase by$8 on July 1 st of each year. unanticipated discovery of utilities and/or hazardous <br /> + Overtime: Standard overtime rate is per California materials. Client is also responsible for providing safe <br /> Labor Law and is billed at 1.5 or 2 times their hourly and legal access to the project site for all Leighton <br /> billing rate. Overtime rate for non-exempt field field personnel. <br /> personnel working on a Leighton observed holiday Earth Material Samples: Quoted testing unit <br /> is billed at 2 times their hourly billing rate. Overtime rates are for soil and/or rock(earth)samples free of <br /> rate for Prevailing wage work is per the California hazardous materials. Additional costs will accrue <br /> Department of Industrial Relations(DIR)determination beyond these standard testing unit rates for handling, <br /> and is multiplied at 1.5 to 2 times their hourly billing rate testing and/or disposing of soil and/or rock containing <br /> for overtime and double-time, respectively. hazardous materials. Hazardous materials will be <br /> Expert Witness Time: Expert witness deposition and returned to the site or the site owner's designated <br /> testimony will be charged at 2 times hourly rates listed representative at additional cost not included in <br /> on the previous pages,with a minimum charge of four listed unit rates. Standard turn-around time for <br /> hours per day. geotechnical-laboratory test results is 10 working <br /> days. Samples will be stored for 2 months following <br /> Minimum Field Hourly Charges: For Field completion of assigned tests, after which they will be <br /> Technicians, Special Inspectors or any on-site(field) discarded. Prior documented notification is required <br /> materials testing services: if samples need to be stored for a longer time. A <br /> 4 hours: 4-hour minimum charge up to the first monthly storage fee of$15 per bag and$6 per sleeve <br /> four hours of work. or tube will be applied. Quoted unit rates are only for <br /> earth materials sampled in California. There may be <br /> 8 hours: 8-hour minimum charge for over four additional cost for handling imported samples. <br /> hours of work, up to eight hours. <br /> Construction Material Samples: After all <br /> Project time accrued includes portal to portal designated breaks for a given sample set meet <br /> travel time. specified compressive at design age or other client- <br /> Insurance&Limitation of Liability: These rates are designated strength, all "hold"cylinders or specimens <br /> predicated on standard insurance coverage and a limit will be automatically disposed of, unless specified in <br /> of Leighton's liability equal to our total fees for a given writing prior to the 28-day break. Unless specifically <br /> project. requested otherwise, all other construction materials <br /> will be disposed of after completion of testing and <br /> Outside Direct Costs: Heavy equipment, reporting. <br /> subcontractor fees and expenses, project-specific <br /> permits and/or licenses, project-specific supplemental <br /> Fee/2024 <br /> City Council 15 —200 7/16/2024 <br /> Harris&Associates, nc. <br />