Laserfiche WebLink
Scope Of Services <br /> The scope for potential tasks includes the following: paving, and that grading plans are signed and sealed <br /> by a registered civil engineer. The review may include <br /> Street Improvement Plans identifying previous preliminary grading permits issued <br /> Cannon will review street improvement plans, utilizing for the project site. <br /> the City's street improvement plan guidelines, provide <br /> comments and recommend for approval. We will Hydrology Studies and Hydraulics <br /> check for compliance with City adopted standard Calculations <br /> drawings, specifications, ADA standards, and Cannon will provide preliminary design review of <br /> applicable regulations using Cannon's in-house plan hydrology/hydraulics technical reports for proposed <br /> check list or as provided by City staff. Services will private development projects and attend City design <br /> include initial and subsequent reviews, full or partial review meetings as necessary. Cannon will apply our <br /> plan review services, interaction with the City and current plan check experience on drainage projects <br /> recommendations to the City staff for final approval. with the City's specific requirements, such as 1) <br /> To confirm adequate document preparation, we will verifying the new site development will not place <br /> attend project status meetings with the City staff(upon additional stress on the existing drainage system, 2) <br /> request) and with others as required to discuss status verify storm frequency of 100 years will not exceed <br /> and/or details of the project. the ultimate street right-of-way and 3) sump conditions <br /> will carry a 100-year storm frequency and have a <br /> We will verify code compliance of street geometrics, secondary "emergency overflow" outlet. Additionally, <br /> typical sections showing cross slopes, centerline, we will verify the proposed finished floor elevation of <br /> right-of-way, dimensions and applicable construction residential buildings are minimum of one foot higher <br /> notes, verify minimum/maximum street profile than 100-year flood. <br /> grades, grade breaks, vertical curve info, review <br /> street profiles of centerline, left and right curbs, Water Quality Management Plans <br /> confirm AC/AB pavement structural section complies <br /> with City standard and/or geotechnical report Cannon will review the WQMP Report submittals to <br /> recommendations, station/elevations at key locations, confirm compliance with the 2011 Orange County <br /> curb ramp details, driveway details, working design Model WQMP, the 2013 Orange County Technical <br /> sections, proposed drainage devices such as catch Guidance Document (TGD) and local jurisdictional <br /> basins with local depressions, and review "join" runoff management program. Our review of each <br /> conditions at limits of work. For any work within WQMP submittal will consist of identifying the process <br /> Caltrans Right-of-Way (intersecting Interstate 5 and that Permittees will employ for developing a Water <br /> State Routes 55 and 22), we will verify compliance Quality Management Plan for new development and <br /> with the Caltrans Standard Plans and Standard significant redevelopment projects. <br /> Specifications. <br /> We review each project proponent to implement a <br /> program that requires structural Best Management <br /> Grading Plans Practices (BMPs) on Priority Development Projects <br /> Cannon will review rough grading plans for substantial to be designed, constructed, and maintained to <br /> conformance to the approved documents from the remove pollutants in storm water to meet the criteria <br /> entitlement process, including but not limited to set forth in the TGD, and existing Hydromodification <br /> tentative map, drainage concepts (hydrology and Management Plan (HMP). <br /> hydraulics), and preliminary WQMP. <br /> Review of precise grading plans consists of <br /> verification of detailed finish grade elevations to show <br /> drainage patterns, flow lines for lot drainage, proposed <br /> • Lannon <br />