Laserfiche WebLink
Our review will include the following: Land Surveying, Legal Description of <br /> • Verify accuracy of project address, description, <br /> Dedication and Final Map Plan Check <br /> site information, the owner's information, or the Cannon's Survey Team is experienced in <br /> person for signing the certification of ownership. processing and reviewing tract and parcel maps, <br /> legal descriptions for easements, dedications, <br /> • Verify the condition of approval is addressed in the abandonments, and lot line adjustments. Cannon <br /> proposed WQMP Report. will review provided title reports and documents, <br /> • Confirm if Hydrologic Condition of Concern and research previously filed maps in the area of the <br /> (HCOC) exists and verify the receiving waters. applicant's submittal for existing conditions to be taken <br /> into consideration by the applicant. The application will <br /> • Verify the Potential Stormwater Pollutants on the be reviewed for technical correctness and standard <br /> project. of care. Drafting standards will be reviewed for <br /> compliance with Subdivision Map Act requirements <br /> • Verify low-impact-development (LID) best and clarity, along with survey calculations and spell <br /> management practices (BMP) selection and checking. Recommendations will be made on all of <br /> project conformance analysis. the above in written format. Direct interaction with <br /> • Conform LID BMPs follow the hierarchy of the Applicant during the plan check process can <br /> infiltration, evapotranspiration, harvest/re-use, and be helpful to ensure a timely plan check review. We <br /> biotreatment. encourage the city to consider authorizing such <br /> coordination. <br /> • Verify that non-structural and structural source <br /> control BMPs are incorporated in the report and Landscape Architectural and Irrigation <br /> onto WQMP Site Plan. Our team will review landscape and irrigation plans, <br /> • Verify if project qualifies for Water Quality Credits. which include water use calculations, to confirm the <br /> plan is prepared by a licensed landscape architect, <br /> • Confirm that BMP inspection and maintenance includes an irrigation system layout with the location <br /> schedule are listed, and the responsible party and of controllers and points of connection with data <br /> the minimum frequency of activities are tabulated on valve sizes and gallons per minute (GPM), the <br /> in the report. size and location of sleeves and all spray heads, <br /> including the location of conventional systems and <br /> • Confirm the that Operations and Maintenance drip systems; an irrigation legend with complete <br /> Plan is prepared and included specifications; irrigation notes and construction details <br /> • Verify the final submittal for recordation of WQMP of all assemblies and components; a recommended <br /> Report includes necessary documents. irrigation schedule, preferably on an annual basis; and <br /> a summary block on the initial page of submitted plans <br /> Geotechnical Reports that will present information clearly and accurately. We <br /> will review that the landscape plan includes a Plant <br /> LOR Geotechnical Group, Inc. (LOR), will provide the Legend containing; plant symbol, scientific name of <br /> following scope items: plant material, common name of plant material, plant <br /> • Review geotechnical plans, and/or reports container size, and plant spacing. We will confirm <br /> prepared by others and submitted to the City. that proposed landscaping shall be compliant with the <br /> City of Santa Ana's Landscape Water Conservation <br /> • Generate geotechnical review comments based Ordinance Chapter 41, Article XVI of the Santa Ana <br /> on current City, County, and/or State standards. Municipal Code and Water Efficient Landscape <br /> • Prepare written comments or approvals by a state ("Guidelines") Appendix A. <br /> licensed Geotechnical Engineer. <br /> • Lannon <br />