Laserfiche WebLink
Craig Siefert, PE <br />Harris is working with LAWA to facilitate expedited <br />plan review within the context of design -build <br />project delivery method in accordance with the <br />City's standards and permit requirements. <br />Eastern Municipal Water District, On -Call Plan <br />Checking and Development Review Services. <br />Project Manager. Harris has been providing <br />development review services to the District since <br />2012. Craig and his team have completed more <br />than 100 projects for the District. Services include <br />review and critique of potable water, recycled <br />water, and sanitary sewer improvements plans for <br />conformance with the District's design guidelines, <br />specifications, and administrative code. Craig and <br />the Harris revised the District's as -built drawings <br />for added water services, per service orders. The <br />Harris team also met with District staff to discuss <br />new project submittals and plan of service and <br />coordinated with the developer's engineer regarding <br />revisions and improvement issues to help facilitate <br />an efficient plan review. <br />City of Menifee, Staff Augmentation & Land <br />Development Plan Checking. Project Manager. <br />Harris has been providing staff augmentation <br />and plan check services for land development <br />for the City since 2016. This includes the review <br />of permits and applications, small grading plan <br />checks, front counter duties, and dealing directly <br />with the public. Additional services provided include <br />review of residential and commercial grading plans, <br />street improvement plans, erosion and sediment <br />control plans, landscaping/ irrigation control plans, <br />hydrology and hydraulics calculations, water <br />quality management plan review, and cost estimate <br />verification. Craig oversees the Harris team placed <br />in the City's offices to confirm proper staffing a <br />quality of work. In addition, Craig has provided <br />input and updates to the City's staff structure, fee <br />collection, and plan tracking processes. <br />Riverside County Flood Control and Water <br />Conservation District, On -Call Plan Review. <br />Project Manager. Since 2020, Harris has been <br />working with the District to review storm drain <br />improvement plans, hydrology, soil structures <br />and CEQA/NEPA requirements for development <br />projects throughout the County. Craig coordinates <br />all plan review projects with the District and <br />manages work quality for the Harris team and <br />subconsultants. <br />City of Rancho Santa Margarita, On -Call Plan <br />Check Services. QA/QC Manager. Services <br />include review of grading plans, street improvement <br />plans, erosion and sediment control plans, <br />landscaping/irrigation control plans, hydrology and <br />hydraulics calculations, and cost estimates. <br />City of Fullerton, Beckman Business Center <br />Entitlement Review. Project Manager. Craig <br />verified calculations for flows regarding the existing <br />drainage channel versus replacing the channel <br />with an underground storm drain line, coordinated <br />comments with the Orange County Flood Control <br />District regarding undersized facilities, reviewed <br />pre- and post -development hydrology reports and <br />maps for drainage related issues, and verified <br />adequacy of flood depth design for safety of an <br />historic building. <br />City of Gonzales, Citywide Sewer Condition <br />Assessment. Project Manager. Harris provided <br />project management and professional engineering <br />services for a citywide sewer cleaning and CCTV <br />inspection/assessment which included condition <br />assessment of 270 gravity sewer manholes <br />and five sewer lift stations, and inspection of <br />approximately 10,000 LF of force main sewer pipes. <br />Craig and the Harris team coordinated with City <br />staff, reviewed subconsultant prepared condition <br />assessment reports, DVDs, and recommendations, <br />and prepared the engineer's preliminary opinion <br />of probable construction costs for related repairs, <br />a prioritization list, and a color -coded Citywide <br />conditions exhibit illustrating the condition of the <br />City's sewer system. <br />City of Fullerton, West Coyote Hills <br />Infrastructure Cost Estimate Analysis. Project <br />Engineer. Craig confirmed the reasonableness <br />of the unit prices in the original estimate using <br />various recent bid prices, his experience, and input <br />from construction contractors/material suppliers <br />and supporting subconsultants as needed. A <br />reasonableness check/order of magnitude check <br />was performed on the quantities. Finally, a <br />review of the pertinent sections of the Conditions <br />of Improvements was performed for additional <br />background information, an understanding of the <br />improvements, and a general confirmation of the <br />proposed project requirements. <br />Harris& Associates, Inc. Appendix N iii <br />