Laserfiche WebLink
Appendix <br /> ATTACHMENT 1 <br /> SCOPE OF WORK <br /> CITY OF SANTA ANA <br /> REQUEST FOR PROPOSALS <br /> FOR <br /> NEW AQUATICS FACILITIY AT MEMORIAL PARK <br /> CONSTRUCTABILITY REVIEW, CONSTRUCTION MANAGEMENT, <br /> AND INSPECTION SERVICES <br /> RFP NO. 24-041A <br /> INTRODUCTION/BACKGROUND <br /> The City of Santa Ana previously solicited proposals Architectural and Engineering services for a <br /> construction of New Aquatic Facilities at Memorial Park (the "Project"). By this Request for Proposals <br /> (RFP), the City now desires to engage a professional consultant to perform constructability review and <br /> construction management services. The consultant shall provide at least three individuals to act as <br /> Construction Manager(CM,the "owner's representative"), Inspector, and a Contract Administrator(CA), <br /> and serve as an extension of City staff to assist in the overall delivery of this project which includes <br /> performing independent review of plans, specifications, and estimate, pre-construction tasks, managing <br /> construction and ensuring that the work is completed in accordance with the funding requirements,contract <br /> documents, and project closeout, commissioning, and warranty phase. The consultant team will report <br /> directly to the City's Construction Manager or his authorized representative. City staff may assist in <br /> managing construction and will oversee the work of the Construction Manager, Inspector, and Contract <br /> Administrator. <br /> Memorial Park,dedicated in May 1950,is a 16.3-acre city park located in the central-south area of the City <br /> of Santa Ana, surrounded by residential properties. The park was dedicated by former Governor Earl <br /> Warren as a living memorial for future generations to honor "the heroic lives who carried the battle for <br /> democracy". The park is currently comprised of four ballfields, concession/restroom building, basketball <br /> courts,volleyball court,handball court,fitness equipment area,playground area,band shell and lawn areas, <br /> walkway, lighting, and the City's largest municipal swimming pool. The park is an island configuration <br /> surrounded by parking. <br /> The community center and pool are both of the original 1956 installation and are a traditional"bath house" <br /> type design.Existing facilities are very old and deteriorated; deferred maintenance and renovations are no <br /> longer effective.The swimming pool shell and walls of the pool equipment room have cracked.In addition <br /> tote building ing age and poor condition,—the floor plan layout does not meet today's programming needs. <br /> Much of the site hardscape is cracked and there are numerous drainage issues. Amenities that have been <br /> added over the years did not follow a master plan, and their layouts do not efficiently utilize the site. This <br /> Project will include the demolition and rebuilding of the aquatics facility(bath house,pool,pool equipment <br /> building)with the following components: <br /> Pool Facility components shall include at a minimum: <br /> • New Aquatics Building,to include: <br /> o Front Desk Area <br /> o Multi-Purpose Room <br /> o Training Room <br /> City of Santa Ana RFP 24-041A <br /> Page Al-1 <br />