Laserfiche WebLink
o Locker Rooms, Showers,Restrooms. Include Family Locker Room <br /> o Staff Offices <br /> o Life Guard Office <br /> o Break Room <br /> o Pool Equipment Room (Mechanical) <br /> o Pool Storage Room <br /> • Swimming Pool <br /> o New 25' x 50' meter pool,with 7'0"depth <br /> o Tall Portable Guard Chairs <br /> o Area for Bleacher Seating <br /> Site Components may include, but is not limited: <br /> • Splash Park Area(approximately 1,000 sf) <br /> • Sports Courts (Basketball, Volleyball, Handball,Pickle Ball) <br /> • Fitness Equipment Area <br /> • Band Shell and Lawn Area <br /> • Picnic <br /> • Open Space <br /> • Walkways,Lighting <br /> • Park Signage <br /> • Site Furnishing (benches,picnic tables,trash receptacles, dog waste stations) <br /> • Historical Marker or dedicated area as "living memorial" to incorporate intention and <br /> dedication by former Governor Earl Warren. <br /> • Storm Water Mitigation <br /> • Waster Wise Landscaping and automated irrigation <br /> Consultant shall also consider circulation, security, visibility, emergency action procedures, <br /> lighting, ease of equipment servicing and delivery, maintenance when laying out functions. <br /> Consultant shall also look to Memorial Park's history to draw cues and inspiration for the park's <br /> redevelopment. <br /> Note: Minor changes to plans and the preparation of the specifications may occur during the RFP process <br /> without notice to the prospective proposer, however,selected firm will have access to the latest documents <br /> once the RFP—has-been awarded <br /> Consultant Responsibilities <br /> The Consultant's responsibilities shall include the following project tasks: <br /> The required services by the Construction Manager(who will be performing plan checking services), the <br /> Inspector, and the Contract Administrator may include the following: <br /> Task 1: Constructability Review <br /> The required services by the Construction Manager and the Inspector will be involved in the review of the <br /> project deliverables which includes,but is not limited to,the following <br /> City of Santa Ana RFP 24-041A <br /> Page Al-2 <br />