My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWINERTON MANAGEMENT & CONSULTING
Clerk
>
Contracts / Agreements
>
S
>
SWINERTON MANAGEMENT & CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 2:09:40 PM
Creation date
7/26/2024 2:04:39 PM
Metadata
Fields
Template:
Contracts
Company Name
SWINERTON MANAGEMENT & CONSULTING
Contract #
A-2024-079
Agency
Public Works
Council Approval Date
6/4/2024
Expiration Date
12/31/2026
Insurance Exp Date
8/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
> Design Development(60%plans), including site section studies,draft specification,and"Opinion <br /> of Probable Cost". <br /> > Construction Documents (90% and 100% Plans), final technical specifications, and finalized <br /> "Opinion of Probable Cost". <br /> ➢ Swimming pool design and overall ADA compliance. <br /> > Mechanical and Electrical System Replacement plans <br /> ➢ Geotechnical Report and Structural Calculations <br /> 1. The CM shall be a registered engineer in the State of California or a Certified Construction Manager <br /> (CCM) and shall possess a minimum of(5) years' experience in construction management. The <br /> CM and the inspector shall be involved in the review of specification and plan checking. These <br /> reviews will focus on constructability, inter-disciplinary coordination, completeness, and general <br /> code compliance. The CM and the Inspector should have relevant experience in construction <br /> management and certifications that affirm the experience. <br /> 2. The CM shall provide a thorough review of the construction sequence necessary to complete the <br /> improvements included in the construction contract. <br /> 3. Review potential utility conflicts and identify items requiring coordination with third party utility <br /> agencies. <br /> 4. Review measurement and payment sections of the Specifications to ensure that the proposed work <br /> specified is covered by a bid item and identify any redundant pay items <br /> 5. Review of bid quantity takeoffs and engineer's estimate. If an error is noted, it will be included in <br /> the list of review comments. <br /> 6. Conduct up to two (2) site visit/field review by as part of the plan review to identify any current <br /> field conditions not reflected on the Plans. <br /> 7. Participate in up to two (2) public meetings to ensure consistency when plan checking. Public <br /> meetings will be hosted by the design consultant. <br /> 8. Participate in bi-weekly meetings with design consultant and City representatives to reduce <br /> discrepancies when plan checking. <br /> 9. Identify the elements of construction that could be substituted with more efficient materials and <br /> associated methods. <br /> 10. Provide a list of items that may be overlapping, extra,not needed or candidates for removal. <br /> 11. Prepare and submit an itemized list of findings and outline recommendations to reconcile issues <br /> discovered and generally to expedite the project. <br /> 12. Review of Geotechnical report and the structural calculations for the purposes of the expected <br /> constructability review. <br /> 13. CM shall provide recommendations for special material testing and inspection that will be needed <br /> during the construction phase. <br /> City of Santa Ana RFP 24-041A <br /> Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.