Laserfiche WebLink
South Coast Technology Center Project <br />CEQA Exemption 15183 <br />As detailed in Table 4.11-1, General Plan Update Land Use Element Proiect Consistency <br />Analysis, the proposed Project would be consistent with the applicable General Plan Update Land <br />Use Element goals and policies. <br />Table 4.11-1 <br />General Plan Update Land Use Element Project Consistency Analysis <br />Applicable General Plan Land Use <br />Project Consistency Analysis <br />Policies <br />Goal LU-1: Provide a land use plan that im roves quality of life and respects our existing community. <br />Policy LU-1.1: Foster compatibility between land <br />Consistent. Surrounding uses adjacent to the Project Site <br />uses to enhance livability and promote healthy <br />include office, commercial, and recreational uses. The <br />lifestyles. <br />Greenville Banning Channel bounds the Project Site to the <br />east and freight rail tracks bound the Project Site to the west. <br />The Project proposes to redevelop the Lake Center Office <br />Park with two new industrial buildings and construct a new <br />industrial building on the vacant parcel west of Susan Street. <br />As discussed previously, the proposed industrial use is <br />consistent with the General Plan Update. The SD-58 District <br />currently includes design standards such as building heights, <br />setbacks, separations, landscaping standards, and signage; <br />and would be amended to include design standards for <br />perimeter fencing and operational standards for the Limited <br />Light Industrial Use to ensure that the Project would be <br />compatible with adjacent and surrounding uses. In addition, <br />the Project would include bicycle parking spaces and EV <br />charging stations, which would promote healthy lifestyles and <br />reduce GHG emissions. <br />Policy LU-1.8: Ensure that new development <br />Consistent. The Project proposes to redevelop the Lake <br />projects provide a net community benefit. <br />Center Office Park with two new industrial buildings and <br />construct a new industrial building on the vacant parcel west of <br />Susan Street. The infill development of the western portion of <br />the Project Site would enhance SD-58 by making it more <br />cohesive. As discussed in Section 4.14, Population and <br />Housing, the proposed Project would generate 425 employees <br />that would be drawn from the City or region. As the proposed <br />Project would provide additional jobs in the City, it would <br />improve the jobs -housing ratio determined in the GPU PEIR <br />and help offset residential population growth impacts resulting <br />from implementation of the General Plan Update. In addition, <br />the Project would include bicycle parking spaces and EV <br />charging stations to encourage alternative modes of <br />transportation and reduce VMT and GHG emissions. Overall, <br />the proposed Project would provide a net community benefit. <br />Policy LU-1.9: Evaluate individual new <br />Consistent. As discussed throughout this document, the <br />development proposals to determine if the <br />proposed Project would be consistent with the General Plan <br />proposals are consistent with the General Plan <br />Update. Additionally, as discussed in Section 4.15, Public <br />and to ensure that they do not compound <br />Services, and Section 4.19, Utilities and Service Systems, the <br />existing public facility and service deficiencies. <br />proposed Project would result in less than significant impacts <br />to public utilities and infrastructure. <br />Goal LU-2: Provide a balance of land uses that meet Santa Ana's diverse needs. <br />Policy LU-2.1: Provide a broad spectrum of land <br />Consistent. Refer to the response to Policy LU-1.8 above. <br />uses and development that offer employment <br />Overall, the proposed Project would offer employment <br />opportunities for current and future Santa Ana <br />opportunities for current and future Santa Ana residents. <br />residents. <br />July 2024 Page 73 <br />