My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 28 - Public Hearing - ZOA No. 20204-01 South Coast Technology Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 9:17:46 AM
Creation date
8/6/2024 8:50:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
8/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Coast Technology Center Project <br />CEQA Exemption 15183 <br />(1) The project is consistent with the development density established by existing zoning, <br />community plan or general plan policies for which an EIR was certified. <br />Based on General Plan Update Land Use Element Figure LU-1, Land Use Map, the Project Site <br />is designated Industrial (IND). According to the General Plan Update Land Use Element Table <br />LU-3, Density and Intensity Standards, the Industrial designation generally allows a maximum <br />0.45 floor -area -ratio (FAR) with a typical maximum building height of 35 feet. However, Table LU- <br />3 provides a specific exception for the Lake Center Development, defined by Specific <br />Development Plan Number 58 (SD-58), that allows intensities up to 0.72 FAR (see Footnote 4 of <br />General Plan Update Land Use Element Table LU-3). Similarly, regarding height, Table LU-3 <br />Footnote 2 explains that the actual maximum standard allowed on each site may be different than <br />listed in Table LU-3 and that the allowable height of development on any parcel is subject to the <br />zoning standards. SD-58 District permits a maximum FAR of 0.72 and a maximum height of 200 <br />feet for the Project Site. <br />The proposed Project would demolish the Lake Center Office Park and construct three new <br />buildings totaling 313,244 square feet. The Project Site is approximately 15.8-acres. Thus, the <br />Project would result in a 0.46 FAR. Additionally, the maximum height of the proposed buildings <br />would be 48 feet and 4 inches. Although the Project proposes to amend SD-58 to allow for <br />industrial uses, the Project would not change the FAR or maximum height allowed in SD-58. Thus, <br />the proposed Project would be consistent with the development density established by the <br />General Plan Update for SD-58. Additionally, the Project would be consistent with applicable <br />General Plan Update Land Use Element policies as detailed in Table 4.11-1. Overall, the Project <br />would be consistent with Criterion (1). <br />(2) There are no project specific effects which are peculiar to the project or its site. <br />The Project Site is located in a highly developed and urbanized area of Santa Ana. The Project <br />Site consists of an existing 10.2-acre office park, the Lake Center Office Park, and an <br />approximately 5.6-acre vacant field to the west of and separated from the office park by the north - <br />south South Susan Street. The Project Site is designated Industrial (IND) and zoned SD-58. <br />Surrounding uses adjacent to the Project Site include office, commercial, government, and <br />recreational uses, and are designated Industrial (IND) and Professional & Administrative Office <br />(PAO). The proposed Project would be consistent with the land use designation of the Project <br />Site. Additionally, operation of the proposed Project as industrial buildings for office, <br />manufacturing, and/or warehouse use would be consistent with the surrounding uses of the <br />Project Site. As evaluated in Section 4.0, there are no Project specific effects which are peculiar <br />to the Project or its site. Therefore, the proposed Project is consistent with Criterion (2). <br />(3) There are no project specific impacts that were not analyzed as significant effects in the <br />prior EIR. <br />The GPU PEIR concluded that buildout of the General Plan Update would result in a total of <br />115,053 residential units and 72,967,816 square feet of non-residential development by 2045. <br />The proposed Project, which is consistent with the General Plan Update, involves the demolition <br />of the Lake Center Office Park and construction of three new buildings. The proposed Project <br />would result in an increase of 135,218 square feet of non-residential uses. The Project would be <br />consistent with the development density requirement for the IND designation and thus, was <br />considered in the planned development of the General Plan Update and would have similar or <br />lesser significant impacts than analyzed in the GPU PEIR. As evaluated in Section 4.0, there are <br />no Project specific impacts which the GPU PEIR did not analyze as significant effects. Therefore, <br />the proposed Project is consistent with Criterion (3). <br />July 2024 Page 101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.