Laserfiche WebLink
South Coast Technology Center Project <br />CEQA Exemption 15183 <br />(4) There are no potentially significant off -site and/or cumulative impacts that were not <br />discussed in the prior EIR. <br />As stated, buildout of the proposed Project is consistent with the General Plan Update and, thus, <br />was considered in the GPU PER analysis. No off -site improvements are proposed in the Project <br />area and the size and nature of the Project would not result in cumulatively considerable <br />environmental impacts. As evaluated in Section 4.0, there are no potentially significant off -site <br />and/or cumulative impacts from the Project which the GPU PER did not discuss. Therefore, the <br />Project is consistent with Criterion (4). <br />(5) There is no substantial new information which results in more severe impacts than <br />anticipated by the prior EIR. <br />As evaluated in Section 4.0, the proposed Project would result in similar and/or lesser impacts <br />than the GPU PER. There is no substantial new information which results in more severe impacts <br />than anticipated by the GPU PER. Therefore, the Project is consistent with Criterion (5). <br />As shown, the proposed Project is consistent with the criteria in CEQA Guidelines Section 15183. <br />As such, the proposed Project qualifies for the CEQA exemption. <br />July 2024 Page 102 <br />